IAC logo
IAC Assessment: SD0554
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Scientific Instrumentation
NAICS 334516 - Analytical Laboratory Instrument Manufacturing
SIC 3826 - Analytical Instruments
Sales $50,000,000-$100,000,000
# of Employees 35
Plant Area (Sq.Ft.) 100,000
Annual Production 140 Units
Production Hrs. Annual 3,060
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $445,496 3,714,374 kWh $0.12
Electricity Demand $176,948 5,032 kW-months/year $35.17
Electricity Fees $10,242 - $ -
TOTAL ENERGY COSTS $632,686
RECOMMENDED SAVINGS* $47,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,665
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$30,343
Cost:
$65,600
$(-1,750) (-14,600) $32,093 912 - - $(-1,750)
(-14,600)
kWh
$32,093
912
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,849
Cost:
$4,785
$8,849 73,805 - - - - $8,849
73,805
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,421
Cost:
$15,275
$2,143 17,854 $3,201 91 $77 - $2,143
17,854
kWh
$3,201
91
kW-months/year
$77
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,214
Cost:
$2,470
$2,214 18,466 - - - - $2,214
18,466
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$356
Cost:
$1,450
$356 2,966 - - - - $356
2,966
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$274
Cost:
$1,300
$274 2,290 - - - - $274
2,290
kWh
-
-
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$271
Cost:
$200
$271 2,260 - - - - $271
2,260
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$47,728
Cost:
$91,080
$12,357 103,041 $35,294 1,003 $77 - $12,357
103,041
kWh
$35,294
1,003
kW-months/year
$77
-
$
TOTAL IMPLEMENTED Savings:
$36,665
Cost:
$83,825
$1,294 10,770 $35,294 1,003 $77 - $1,294
10,770
kWh
$35,294
1,003
kW-months/year
$77
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost