Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2018
Principal Product Water Reclamation Plant
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 1,500,000
Annual Production 22,000,000 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,516,170 27,120,802 kWh $0.06
Electricity Demand $1 104,213 kW-months/year $0.00
TOTAL ENERGY COSTS $1,516,171
RECOMMENDED SAVINGS* $34,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,844
Cost:
$45,396
$21,844 390,778 $21,844
390,778
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,568
Cost:
$90,762
$11,568 206,946 $11,568
206,946
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$795
Cost:
$1,723
$795 14,214 $795
14,214
kWh
TOTAL RECOMMENDED Savings:
$34,207
Cost:
$137,881
$34,207 611,938 $34,207
611,938
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage