IAC Assessment: SD0576
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0576
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Aerospace manufacturing
NAICS 334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 200,000
Annual Production 120,000,000 Units
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $366,724 5,395,158 kWh $0.07
Electricity Demand $386,370 14,448 kW-months/year $26.74
Electricity Fees $44,241 - $ -
Natural Gas $10,686 1,476 MMBtu $7.24
TOTAL ENERGY COSTS $808,021
RECOMMENDED SAVINGS* $54,539 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,212
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,703
Cost:
$57,500
$25,252 371,353 $18,451 690 $25,252
371,353
kWh
$18,451
690
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,047
Cost:
$900
$4,047 59,520 - - $4,047
59,520
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,280
Cost:
$8,325
$1,997 29,365 $1,283 48 $1,997
29,365
kWh
$1,283
48
kW-months/year
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,774
Cost:
$5,676
$1,688 24,830 $1,086 41 $1,688
24,830
kWh
$1,086
41
kW-months/year
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$587
Cost:
$1,720
$587 8,626 - - $587
8,626
kWh
-
-
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$148
Cost:
$350
$105 1,543 $43 2 $105
1,543
kWh
$43
2
kW-months/year
TOTAL RECOMMENDED Savings:
$54,539
Cost:
$74,471
$33,676 495,237 $20,863 780 $33,676
495,237
kWh
$20,863
780
kW-months/year
TOTAL IMPLEMENTED Savings:
$47,212
Cost:
$65,246
$27,632 406,352 $19,580 732 $27,632
406,352
kWh
$19,580
732
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand