IAC logo
IAC Assessment: SD0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2019
Principal Product Roofing
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $1,000,000-$5,000,000
# of Employees 106
Plant Area (Sq.Ft.) 66,000
Annual Production 3,500,000 Units
Production Hrs. Annual 3,822
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,240 1,550,642 kWh $0.07
Electricity Demand $162,443 6,008 kW-months/year $27.04
Electricity Fees $10,757 - $ -
TOTAL ENERGY COSTS $279,440
RECOMMENDED SAVINGS* $20,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,759
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$15,684
Cost:
$52,500
$6,654 97,122 $9,030 334 - - $6,654
97,122
kWh
$9,030
334
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,956
Cost:
$5,187
$1,252 18,287 $1,629 60 $75 - $1,252
18,287
kWh
$1,629
60
kW-months/year
$75
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,075
Cost:
-
$1,075 15,695 - - - - $1,075
15,695
kWh
-
-
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$631
Cost:
$522
$279 4,066 $352 13 - - $279
4,066
kWh
$352
13
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$20,346
Cost:
$58,209
$9,260 135,170 $11,011 407 $75 - $9,260
135,170
kWh
$11,011
407
kW-months/year
$75
-
$
TOTAL IMPLEMENTED Savings:
$16,759
Cost:
$52,500
$7,729 112,817 $9,030 334 - - $7,729
112,817
kWh
$9,030
334
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost