Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2020 |
Principal Product | Block and Brick |
NAICS | 327331 - Concrete Block and Brick Manufacturing |
SIC | 3251 - Brick And Structural Clay Tile |
Sales | $50,000,000-$100,000,000 |
# of Employees | 57 |
Plant Area (Sq.Ft.) | 104,000 |
Annual Production | 13,000,000 Units |
Production Hrs. Annual | 4,973 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $217,244 | 1,875,630 | kWh | $0.12 |
Electricity Demand | $268,538 | 6,782 | kW-months/year | $39.59 |
Electricity Fees | $37,527 | - | $ | - |
TOTAL ENERGY COSTS | $523,309 | |||
RECOMMENDED SAVINGS* | $15,665 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,665 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,364 Cost: $5,800 |
$2,799 | 24,169 | $2,565 | 65 | - | - |
$2,799 24,169 kWh |
$2,565 65 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,309 Cost: $3,594 |
$2,343 | 20,239 | $1,936 | 49 | $30 | - |
$2,343 20,239 kWh |
$1,936 49 kW-months/year |
$30 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,802 Cost: $6,300 |
$1,811 | 15,637 | $1,991 | 50 | - | - |
$1,811 15,637 kWh |
$1,991 50 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,190 Cost: $4,000 |
$1,200 | 10,371 | $990 | 25 | - | - |
$1,200 10,371 kWh |
$990 25 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,665 Cost: $19,694 |
$8,153 | 70,416 | $7,482 | 189 | $30 | - | $8,153 70,416 kWh |
$7,482 189 kW-months/year |
$30 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,665 Cost: $19,694 |
$8,153 | 70,416 | $7,482 | 189 | $30 | - | $8,153 70,416 kWh |
$7,482 189 kW-months/year |
$30 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |