IAC Assessment: SD0637
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0637
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Electronic Components, Circuit boards, Industrial Wiring
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 12,000
Annual Production 100,000 Units
Production Hrs. Annual 4,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,088 315,984 kWh $0.15
Electricity Demand $63,586 1,148 kW-months/year $55.41
Electricity Fees $2,941 - $ -
Natural Gas $7,582 471 MMBtu $16.11
TOTAL ENERGY COSTS $121,197
RECOMMENDED SAVINGS* $158,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,338
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$283
Cost:
$250
$283 1,896 - - - - $283
1,896
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$665
Cost:
$2,159
$293 1,969 $372 7 - - $293
1,969
kWh
$372
7
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,393
Cost:
$700
$617 4,140 $776 14 - - $617
4,140
kWh
$776
14
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,593
Cost:
$8,642
$2,567 17,230 $5,209 94 $(-1,183) (-73) $2,567
17,230
kWh
$5,209
94
kW-months/year
$(-1,183)
(-73)
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$65,827
Cost:
$115,927
$23,937 160,650 $41,890 756 - - $23,937
160,650
kWh
$41,890
756
kW-months/year
-
-
MMBtu
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$53,597
Cost:
-
$(-3,254) (-21,838) $56,851 1,026 - - $(-3,254)
(-21,838)
kWh
$56,851
1,026
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$788
Cost:
$1,660
$391 2,626 $397 7 - - $391
2,626
kWh
$397
7
kW-months/year
-
-
MMBtu
08: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$1,662
Cost:
-
- - $1,662 30 - - -
-
kWh
$1,662
30
kW-months/year
-
-
MMBtu
09: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$1,900
Cost:
$2,000
$1,900 12,754 - - - - $1,900
12,754
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$25,625
Cost:
$49,475
$10,465 70,236 $15,160 274 - - $10,465
70,236
kWh
$15,160
274
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$158,333
Cost:
$180,813
$37,199 249,663 $122,317 2,208 $(-1,183) (-73) $37,199
249,663
kWh
$122,317
2,208
kW-months/year
$(-1,183)
(-73)
MMBtu
TOTAL IMPLEMENTED Savings:
$3,338
Cost:
$950
$900 6,036 $2,438 44 - - $900
6,036
kWh
$2,438
44
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas