IAC logo
IAC Assessment: SD0652
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0652
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Powder Coating
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 98,000
Annual Production 100,000 Units
Production Hrs. Annual 4,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $232,210 1,391,027 kWh $0.17
Electricity Demand $167,724 5,926 kW-months/year $28.30
Electricity Fees $11,316 - $ -
Natural Gas $386,108 29,356 MMBtu $13.15
TOTAL ENERGY COSTS $797,358
RECOMMENDED SAVINGS* $550,978 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,198
Cost:
$8,767
$7,053 42,258 $3,071 109 - - $74 - $7,053
42,258
kWh
$3,071
109
kW-months/year
-
-
MMBtu
$74
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$250,838
Cost:
$353,389
$148,958 892,500 $101,880 3,600 - - - - $148,958
892,500
kWh
$101,880
3,600
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$142,534
Cost:
-
$(-18,776) (-112,500) $161,310 5,700 - - - - $(-18,776)
(-112,500)
kWh
$161,310
5,700
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,512
Cost:
$688
- - - - $2,512 191 - - -
-
kWh
-
-
kW-months/year
$2,512
191
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,698
Cost:
$13,276
$11,830 70,880 $7,868 278 - - - - $11,830
70,880
kWh
$7,868
278
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$88,120
Cost:
$102,485
- - - - $88,120 6,701 - - -
-
kWh
-
-
kW-months/year
$88,120
6,701
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,448
Cost:
$3,388
$845 5,064 $603 21 - - - - $845
5,064
kWh
$603
21
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$4,393
Cost:
$6,286
$4,393 26,318 - - - - - - $4,393
26,318
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$978
Cost:
$4,000
- - - - $978 74 - - -
-
kWh
-
-
kW-months/year
$978
74
MMBtu
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,579
Cost:
$33,698
$4,426 26,520 $3,153 111 - - - - $4,426
26,520
kWh
$3,153
111
kW-months/year
-
-
MMBtu
-
-
$
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,089
Cost:
$2,000
$4,089 24,499 - - - - - - $4,089
24,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,888
Cost:
$11,237
$3,888 23,298 - - - - - - $3,888
23,298
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
13: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$14,703
Cost:
$2,400
$14,703 88,093 - - - - - - $14,703
88,093
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$550,978
Cost:
$541,614
$181,409 1,086,930 $277,885 9,819 $91,610 6,966 $74 - $181,409
1,086,930
kWh
$277,885
9,819
kW-months/year
$91,610
6,966
MMBtu
$74
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost