Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Movie Picture & Video Production
NAICS 512110 - Motion Picture and Video Production
SIC 7812 - Motion Picture & Video Production
Sales $100,000,000-$500,000,000
# of Employees 1,200
Plant Area (Sq.Ft.) 2,787,840
Annual Production 100 Units
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,424,249 16,545,399 kWh $0.27
Electricity Demand $293,809 64,431 kW-months/year $4.56
Natural Gas $5,926 1,022 MMBtu $5.80
TOTAL ENERGY COSTS $4,723,984
RECOMMENDED SAVINGS* $1,741,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$249,555
Cost:
$400,591
$232,745 870,400 $16,810 3,686 - - - - $232,745
870,400
kWh
$16,810
3,686
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,912
Cost:
-
- - $2,912 639 - - - - -
-
kWh
$2,912
639
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$7,731
Cost:
$3,463
$7,469 27,935 $206 44 - - $56 - $7,469
27,935
kWh
$206
44
kW-months/year
-
-
MMBtu
$56
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,224
Cost:
$4,470
$7,030 26,292 $194 42 - - - - $7,030
26,292
kWh
$194
42
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$1,431,356
Cost:
$2,700
$1,410,364 5,274,360 $20,992 4,604 - - - - $1,410,364
5,274,360
kWh
$20,992
4,604
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$39,277
Cost:
$137,300
$36,859 137,843 $2,418 530 - - - - $36,859
137,843
kWh
$2,418
530
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$2,963
Cost:
-
- - - - $2,963 511 - - -
-
kWh
-
-
kW-months/year
$2,963
511
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,741,018
Cost:
$548,524
$1,694,467 6,336,830 $43,532 9,545 $2,963 511 $56 - $1,694,467
6,336,830
kWh
$43,532
9,545
kW-months/year
$2,963
511
MMBtu
$56
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost