IAC Assessment: SD0676
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0676
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2025
Principal Product Metal Treatment
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 64,000
Annual Production 400 Units
Production Hrs. Annual 3,188
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $586,685 3,704,765 kWh $0.16
Electricity Demand $734,855 12,932 kW-months/year $56.82
Electricity Fees $(-535,389) - $ -
TOTAL ENERGY COSTS $786,151
RECOMMENDED SAVINGS* $513,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$35,908
Cost:
$47,771
$14,674 92,642 $21,234 374 - - - - $14,674
92,642
kWh
$21,234
374
kW-months/year
-
-
$
-
-
$
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$109,396
Cost:
$5,254
$(-6,370) (-40,212) $115,766 2,037 - - - - $(-6,370)
(-40,212)
kWh
$115,766
2,037
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,618
Cost:
$1,911
$1,114 7,032 $1,504 26 - - - - $1,114
7,032
kWh
$1,504
26
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,510
Cost:
$44,993
$31,109 196,395 $8,401 148 - - - - $31,109
196,395
kWh
$8,401
148
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,805
Cost:
-
$1,805 11,397 - - - - - - $1,805
11,397
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,821
Cost:
$7,047
$5,880 37,119 $7,941 140 - - - - $5,880
37,119
kWh
$7,941
140
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,684
Cost:
$2,699
$1,315 8,300 $369 7 - - - - $1,315
8,300
kWh
$369
7
kW-months/year
-
-
$
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$143,491
Cost:
-
- - - - $143,491 - - - -
-
kWh
-
-
kW-months/year
$143,491
-
$
-
-
$
09: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$153,587
Cost:
$200,000
- - - - - - $153,587 - -
-
kWh
-
-
kW-months/year
-
-
$
$153,587
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,179
Cost:
$8,868
$6,455 40,748 $2,724 48 - - - - $6,455
40,748
kWh
$2,724
48
kW-months/year
-
-
$
-
-
$
11: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,478
Cost:
$2,050
$1,326 8,368 $1,153 20 - - - - $1,326
8,368
kWh
$1,153
20
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$513,478
Cost:
$320,593
$57,307 361,789 $159,093 2,800 $143,491 - $153,587 - $57,307
361,789
kWh
$159,093
2,800
kW-months/year
$143,491
-
$
$153,587
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Primary Raw Material