IAC logo
IAC Assessment: SF0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1993
Principal Product Custom Molded Plastics and Cork
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 140,000
Annual Production 4,000 Tons
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,715 4,210,434 kWh $0.09
TOTAL ENERGY COSTS $389,715
RECOMMENDED SAVINGS* $81,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,163
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$18,225
Cost:
$2,514
$18,225 197,245 $18,225
197,245
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,017
Cost:
$4,460
$9,017 97,304 $9,017
97,304
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,329
Cost:
$3,611
$2,329 25,205 $2,329
25,205
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,817
Cost:
$600
$1,817 19,637 $1,817
19,637
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,548
Cost:
$550
$2,548 27,550 $2,548
27,550
kWh
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$44,008
Cost:
$149,000
$44,008 - $44,008
-
kWh
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,213
Cost:
$5,507
$3,213 - $3,213
-
kWh
TOTAL RECOMMENDED Savings:
$81,157
Cost:
$166,242
$81,157 366,941 $81,157
366,941
kWh
TOTAL IMPLEMENTED Savings:
$13,163
Cost:
$8,671
$13,163 142,146 $13,163
142,146
kWh