IAC logo
IAC Assessment: SF0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1994
Principal Product Plastic Buckets
NAICS n/a
SIC 3079 -
Sales $10,000,000-$50,000,000
# of Employees 49
Plant Area (Sq.Ft.) 46,080
Annual Production 11,000,000 Pieces
Production Hrs. Annual 4,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $459,537 6,148,886 kWh $0.07
Natural Gas $5,215 964 MMBtu $5.41
TOTAL ENERGY COSTS $464,752
RECOMMENDED SAVINGS* $82,779 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,620
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$58,970
Cost:
$168,500
$58,970 576,202 $58,970
576,202
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,109
Cost:
$3,452
$8,109 79,132 $8,109
79,132
kWh
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,447
Cost:
$900
$3,447 33,705 $3,447
33,705
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,267
Cost:
$4,138
$3,267 31,946 $3,267
31,946
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,955
Cost:
$2,545
$1,955 19,050 $1,955
19,050
kWh
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,794
Cost:
$5,000
$1,794 17,585 $1,794
17,585
kWh
07: 2.7145 INSTALL SKYLIGHTS Savings:
$1,675
Cost:
$4,800
$1,675 16,413 $1,675
16,413
kWh
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$357
Cost:
$592
$357 3,517 $357
3,517
kWh
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$575
Cost:
$135
$575 5,569 $575
5,569
kWh
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$297
Cost:
-
$297 2,052 $297
2,052
kWh
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,333
Cost:
$3,593
$2,333 - $2,333
-
kWh
TOTAL RECOMMENDED Savings:
$82,779
Cost:
$193,655
$82,779 785,171 $82,779
785,171
kWh
TOTAL IMPLEMENTED Savings:
$76,620
Cost:
$179,670
$76,620 747,656 $76,620
747,656
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage