IAC Assessment: SF0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Processed Eggs
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 35,000
Annual Production 450,000 Units
Production Hrs. Annual 2,500
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $303,814 3,539,273 kWh $0.09
Natural Gas $93,309 16,311 MMBtu $5.72
TOTAL ENERGY COSTS $397,123
RECOMMENDED SAVINGS* $82,913 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,563
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$390
Cost:
$1,548
$390 4,396 - - $390
4,396
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$826
Cost:
$2,750
$826 9,672 - - $826
9,672
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,925
Cost:
$13,715
$5,925 68,875 - - $5,925
68,875
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$808
Cost:
$1,116
$808 9,379 - - $808
9,379
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$830
Cost:
$1,650
$1,159 13,482 $(-329) (-58) $1,159
13,482
kWh
$(-329)
(-58)
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,861
Cost:
$5,341
$2,861 - - - $2,861
-
kWh
-
-
MMBtu
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$71,273
Cost:
$230,000
$157,451 1,845,252 $(-86,178) (-15,066) $157,451
1,845,252
kWh
$(-86,178)
(-15,066)
MMBtu
TOTAL RECOMMENDED Savings:
$82,913
Cost:
$256,120
$169,420 1,951,056 $(-86,507) (-15,124) $169,420
1,951,056
kWh
$(-86,507)
(-15,124)
MMBtu
TOTAL IMPLEMENTED Savings:
$7,563
Cost:
$16,481
$7,892 91,736 $(-329) (-58) $7,892
91,736
kWh
$(-329)
(-58)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas