Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1995 |
Principal Product | Printed Circuit Boards |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 750 Thousand Feet |
Production Hrs. Annual | 4,576 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $430,056 | 4,073,564 | kWh | $0.11 |
Natural Gas | $184,968 | 34,340 | MMBtu | $5.39 |
TOTAL ENERGY COSTS | $615,024 | |||
RECOMMENDED SAVINGS* | $571,597 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $190,787 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $850 Cost: $708 |
$850 | 7,913 | - | - | - | - | - | - | - | - | - | - |
$850 7,913 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,130 Cost: $4,400 |
$3,130 | 29,601 | - | - | - | - | - | - | - | - | - | - |
$3,130 29,601 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $9,070 Cost: $21,000 |
$9,070 | 109,906 | - | - | - | - | - | - | - | - | - | - |
$9,070 109,906 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,751 Cost: $250 |
$4,751 | 45,135 | - | - | - | - | - | - | - | - | - | - |
$4,751 45,135 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $87,599 Cost: $18,750 |
$87,599 | 829,719 | - | - | - | - | - | - | - | - | - | - |
$87,599 829,719 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $56,940 Cost: $140,000 |
$56,940 | - | - | - | - | - | - | - | - | - | - | - |
$56,940 - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $791 Cost: $1,680 |
$791 | 7,620 | - | - | - | - | - | - | - | - | - | - |
$791 7,620 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $194,002 Cost: $547,100 |
$427,993 | 4,073,564 | $(-233,991) | (-43,441) | - | - | - | - | - | - | - | - |
$427,993 4,073,564 kWh |
$(-233,991) (-43,441) MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1223 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING |
Savings: $29,556 Cost: $3,040 |
- | - | - | - | $27,032 | 2,231,000 | $2,524 | 12,061 | - | - | - | - |
- - kWh |
- - MMBtu |
$27,032 2,231,000 Tgal |
$2,524 12,061 lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1227 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) |
Savings: $1,680 Cost: $3,546 |
- | - | - | - | $1,493 | 1,315,340 | - | - | - | - | $187 | - |
- - kWh |
- - MMBtu |
$1,493 1,315,340 Tgal |
- - lb |
- - lb |
$187 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $5,490 Cost: - |
- | - | - | - | - | - | $242 | 6,115 | - | - | $5,248 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$242 6,115 lb |
- - lb |
$5,248 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $177,738 Cost: $250,240 |
- | - | - | - | - | - | - | - | $177,738 | 301,947 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$177,738 301,947 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $571,597 Cost: $990,714 |
$591,124 | 5,103,458 | $(-233,991) | (-43,441) | $28,525 | 3,546,340 | $2,766 | 18,176 | $177,738 | 301,947 | $5,435 | - | $591,124 5,103,458 kWh |
$(-233,991) (-43,441) MMBtu |
$28,525 3,546,340 Tgal |
$2,766 18,176 lb |
$177,738 301,947 lb |
$5,435 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $190,787 Cost: $172,374 |
$154,061 | 919,988 | - | - | $28,525 | 3,546,340 | $2,766 | 18,176 | - | - | $5,435 | - | $154,061 919,988 kWh |
- - MMBtu |
$28,525 3,546,340 Tgal |
$2,766 18,176 lb |
- - lb |
$5,435 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |