IAC logo
IAC Assessment: SF0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Wood Stock
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 100,000
Annual Production 28,000 Thousand Feet
Production Hrs. Annual 4,862
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $305,260 2,865,768 kWh $0.11
Natural Gas $713 89 MMBtu $8.01
TOTAL ENERGY COSTS $305,973
RECOMMENDED SAVINGS* $219,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,109
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,829
Cost:
$2,843
$1,829 17,292 - - $1,829
17,292
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,431
Cost:
$11,418
$6,431 60,375 - - $6,431
60,375
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$40,803
Cost:
$27,430
$40,803 383,060 - - $40,803
383,060
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,611
Cost:
$250
$3,611 33,998 - - $3,611
33,998
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,669
Cost:
$1,510
$3,669 34,584 - - $3,669
34,584
kWh
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,137
Cost:
$4,459
$3,137 - - - $3,137
-
kWh
-
-
MMBtu
07: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$17,555
Cost:
$37,000
$17,555 164,713 - - $17,555
164,713
kWh
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$142,905
Cost:
$479,000
$305,186 2,865,768 $(-162,281) (-34,309) $305,186
2,865,768
kWh
$(-162,281)
(-34,309)
MMBtu
TOTAL RECOMMENDED Savings:
$219,940
Cost:
$563,910
$382,221 3,559,790 $(-162,281) (-34,309) $382,221
3,559,790
kWh
$(-162,281)
(-34,309)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,109
Cost:
$4,603
$9,109 85,874 - - $9,109
85,874
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas