IAC logo
IAC Assessment: SF0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Case Goods & Seeting
NAICS n/a
SIC 2599 - Furniture And Fixtures, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 153,694
Annual Production 9,600 Units
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,713 2,197,538 kWh $0.12
Natural Gas $13,389 2,083 MMBtu $6.43
TOTAL ENERGY COSTS $271,102
RECOMMENDED SAVINGS* $83,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,635
#|Description Savings
Cost
Status Electricity Usage Natural Gas By-product Production Electricity Usage Natural Gas By-product Production
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,248
Cost:
$20,160
$5,248 44,842 - - - - $5,248
44,842
kWh
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,174
Cost:
$3,300
$2,174 18,464 - - - - $2,174
18,464
kWh
-
-
MMBtu
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$12,233
Cost:
$1,000
$12,233 104,338 - - - - $12,233
104,338
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,062
Cost:
$2,666
$1,062 9,086 - - - - $1,062
9,086
kWh
-
-
MMBtu
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$847
Cost:
$2,867
$847 7,327 - - - - $847
7,327
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,141
Cost:
$1,587
$3,141 26,671 - - - - $3,141
26,671
kWh
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,680
Cost:
$62,972
$35,680 304,220 - - - - $35,680
304,220
kWh
-
-
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,266
Cost:
$7,015
$7,054 60,082 $(-1,788) (-257) - - $7,054
60,082
kWh
$(-1,788)
(-257)
MMBtu
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,731
Cost:
$6,605
$7,823 66,823 $(-2,092) (-325) - - $7,823
66,823
kWh
$(-2,092)
(-325)
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,393
Cost:
$700
$1,393 12,016 - - - - $1,393
12,016
kWh
-
-
MMBtu
-
-
$
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$6,972
Cost:
$9,060
- - - - $6,972 - -
-
kWh
-
-
MMBtu
$6,972
-
$
12: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$3,888
Cost:
$14,750
- - - - $3,888 - -
-
kWh
-
-
MMBtu
$3,888
-
$
TOTAL RECOMMENDED Savings:
$83,635
Cost:
$132,682
$76,655 653,869 $(-3,880) (-582) $10,860 - $76,655
653,869
kWh
$(-3,880)
(-582)
MMBtu
$10,860
-
$
TOTAL IMPLEMENTED Savings:
$83,635
Cost:
$132,682
$76,655 653,869 $(-3,880) (-582) $10,860 - $76,655
653,869
kWh
$(-3,880)
(-582)
MMBtu
$10,860
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas By-product Production Electricity Usage Natural Gas By-product Production