Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1995 |
Principal Product | Case Goods & Seeting |
NAICS | n/a |
SIC | 2599 - Furniture And Fixtures, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 165 |
Plant Area (Sq.Ft.) | 153,694 |
Annual Production | 9,600 Units |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $257,713 | 2,197,538 | kWh | $0.12 |
Natural Gas | $13,389 | 2,083 | MMBtu | $6.43 |
TOTAL ENERGY COSTS | $271,102 | |||
RECOMMENDED SAVINGS* | $83,635 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | By-product Production | Electricity Usage | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,248 Cost: $20,160 |
$5,248 | 44,842 | - | - | - | - |
$5,248 44,842 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,174 Cost: $3,300 |
$2,174 | 18,464 | - | - | - | - |
$2,174 18,464 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $12,233 Cost: $1,000 |
$12,233 | 104,338 | - | - | - | - |
$12,233 104,338 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,062 Cost: $2,666 |
$1,062 | 9,086 | - | - | - | - |
$1,062 9,086 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $847 Cost: $2,867 |
$847 | 7,327 | - | - | - | - |
$847 7,327 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,141 Cost: $1,587 |
$3,141 | 26,671 | - | - | - | - |
$3,141 26,671 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $35,680 Cost: $62,972 |
$35,680 | 304,220 | - | - | - | - |
$35,680 304,220 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,266 Cost: $7,015 |
$7,054 | 60,082 | $(-1,788) | (-257) | - | - |
$7,054 60,082 kWh |
$(-1,788) (-257) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,731 Cost: $6,605 |
$7,823 | 66,823 | $(-2,092) | (-325) | - | - |
$7,823 66,823 kWh |
$(-2,092) (-325) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,393 Cost: $700 |
$1,393 | 12,016 | - | - | - | - |
$1,393 12,016 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $6,972 Cost: $9,060 |
- | - | - | - | $6,972 | - |
- - kWh |
- - MMBtu |
$6,972 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $3,888 Cost: $14,750 |
- | - | - | - | $3,888 | - |
- - kWh |
- - MMBtu |
$3,888 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $83,635 Cost: $132,682 |
$76,655 | 653,869 | $(-3,880) | (-582) | $10,860 | - | $76,655 653,869 kWh |
$(-3,880) (-582) MMBtu |
$10,860 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,635 Cost: $132,682 |
$76,655 | 653,869 | $(-3,880) | (-582) | $10,860 | - | $76,655 653,869 kWh |
$(-3,880) (-582) MMBtu |
$10,860 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||