IAC logo
IAC Assessment: SF0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Metal Closures
NAICS n/a
SIC 3466 - Crowns And Closures
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 50,000
Annual Production 1,500,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $462,494 7,504,983 kWh $0.06
Electricity Demand $187,986 14,979 kW-months/year $12.55
Natural Gas $369,308 147,599 MMBtu $2.50
TOTAL ENERGY COSTS $1,031,008
RECOMMENDED SAVINGS* $54,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,092
Cost:
$2,932
$3,065 49,824 $1,027 82 - - $3,065
49,824
kWh
$1,027
82
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,724
Cost:
$17,620
$3,762 60,961 $1,962 156 - - $3,762
60,961
kWh
$1,962
156
kW-months/year
-
-
lb
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,473
Cost:
$12,145
$8,413 136,577 $2,060 164 - - $8,413
136,577
kWh
$2,060
164
kW-months/year
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$22,161
Cost:
$8,797
$18,561 179,367 $3,600 286 - - $18,561
179,367
kWh
$3,600
286
kW-months/year
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$8,134
Cost:
$3,201
$6,132 19,050 $2,002 159 - - $6,132
19,050
kWh
$2,002
159
kW-months/year
-
-
lb
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$304
Cost:
-
$184 2,931 $120 9 - - $184
2,931
kWh
$120
9
kW-months/year
-
-
lb
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$612
Cost:
-
$526 8,499 $86 7 - - $526
8,499
kWh
$86
7
kW-months/year
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,880
Cost:
-
- - - - $2,880 144,000 -
-
kWh
-
-
kW-months/year
$2,880
144,000
lb
TOTAL RECOMMENDED Savings:
$54,380
Cost:
$44,695
$40,643 457,209 $10,857 863 $2,880 144,000 $40,643
457,209
kWh
$10,857
863
kW-months/year
$2,880
144,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)