IAC logo
IAC Assessment: SF0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Microwave Components
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 208
Plant Area (Sq.Ft.) 34,000
Annual Production 24,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,835 1,178,781 kWh $0.09
Electricity Demand $17,853 3,069 kW-months/year $5.82
Natural Gas $5,364 730 MMBtu $7.35
TOTAL ENERGY COSTS $131,481
RECOMMENDED SAVINGS* $21,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,121
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,635
Cost:
$28,440
$10,460 122,216 $2,175 374 - - - - $10,460
122,216
kWh
$2,175
374
kW-months/year
-
-
gal
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$668
Cost:
$835
$668 7,620 - - - - - - $668
7,620
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$239
Cost:
$550
$219 2,638 $20 3 - - - - $219
2,638
kWh
$20
3
kW-months/year
-
-
gal
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$368
Cost:
$595
$333 3,810 $35 6 - - - - $333
3,810
kWh
$35
6
kW-months/year
-
-
gal
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,222
Cost:
$3,410
$1,965 22,860 $257 44 - - - - $1,965
22,860
kWh
$257
44
kW-months/year
-
-
gal
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,228
Cost:
-
- - - - - - $1,228 - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,228
-
lb
07: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$3,656
Cost:
$3,995
- - - - $3,656 762 - - -
-
kWh
-
-
kW-months/year
$3,656
762
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$21,016
Cost:
$37,825
$13,645 159,144 $2,487 427 $3,656 762 $1,228 - $13,645
159,144
kWh
$2,487
427
kW-months/year
$3,656
762
gal
$1,228
-
lb
TOTAL IMPLEMENTED Savings:
$17,121
Cost:
$33,280
$13,426 156,506 $2,467 424 - - $1,228 - $13,426
156,506
kWh
$2,467
424
kW-months/year
-
-
gal
$1,228
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)