Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1996 |
Principal Product | Metal Casting, Injection Molded Plastic Products |
NAICS | n/a |
SIC | 3355 - Aluminum Rolling And Drawing, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 45,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $55,250 | 619,285 | kWh | $0.09 |
Electricity Demand | $9,828 | 2,292 | kW-months/year | $4.29 |
Natural Gas | $62,533 | 9,277 | MMBtu | $6.74 |
TOTAL ENERGY COSTS | $186,551 | |||
RECOMMENDED SAVINGS* | $16,267 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,267 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $348 Cost: $577 |
$272 | 2,931 | $76 | 17 | - | - | - | - |
$272 2,931 kWh |
$76 17 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,366 Cost: $13,620 |
$1,852 | 20,809 | $514 | 120 | - | - | - | - |
$1,852 20,809 kWh |
$514 120 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,425 Cost: $3,900 |
- | - | - | - | $8,425 | 1,250 | - | - |
- - kWh |
- - kW-months/year |
$8,425 1,250 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $833 Cost: - |
$690 | 7,620 | $143 | 33 | - | - | - | - |
$690 7,620 kWh |
$143 33 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $434 Cost: $525 |
$340 | 3,810 | $94 | 22 | - | - | - | - |
$340 3,810 kWh |
$94 22 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,880 Cost: $500 |
- | - | - | - | - | - | $2,880 | 199,200 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,880 199,200 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $981 Cost: - |
- | - | - | - | - | - | $981 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$981 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,267 Cost: $19,122 |
$3,154 | 35,170 | $827 | 192 | $8,425 | 1,250 | $3,861 | 199,200 | $3,154 35,170 kWh |
$827 192 kW-months/year |
$8,425 1,250 MMBtu |
$3,861 199,200 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,267 Cost: $19,122 |
$3,154 | 35,170 | $827 | 192 | $8,425 | 1,250 | $3,861 | 199,200 | $3,154 35,170 kWh |
$827 192 kW-months/year |
$8,425 1,250 MMBtu |
$3,861 199,200 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |