IAC logo
IAC Assessment: SF0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Metal Casting, Injection Molded Plastic Products
NAICS n/a
SIC 3355 - Aluminum Rolling And Drawing, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 40,000
Annual Production 45,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,250 619,285 kWh $0.09
Electricity Demand $9,828 2,292 kW-months/year $4.29
Natural Gas $62,533 9,277 MMBtu $6.74
TOTAL ENERGY COSTS $186,551
RECOMMENDED SAVINGS* $16,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,267
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$348
Cost:
$577
$272 2,931 $76 17 - - - - $272
2,931
kWh
$76
17
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,366
Cost:
$13,620
$1,852 20,809 $514 120 - - - - $1,852
20,809
kWh
$514
120
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,425
Cost:
$3,900
- - - - $8,425 1,250 - - -
-
kWh
-
-
kW-months/year
$8,425
1,250
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$833
Cost:
-
$690 7,620 $143 33 - - - - $690
7,620
kWh
$143
33
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$434
Cost:
$525
$340 3,810 $94 22 - - - - $340
3,810
kWh
$94
22
kW-months/year
-
-
MMBtu
-
-
lb
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$2,880
Cost:
$500
- - - - - - $2,880 199,200 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,880
199,200
lb
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$981
Cost:
-
- - - - - - $981 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$981
-
lb
TOTAL RECOMMENDED Savings:
$16,267
Cost:
$19,122
$3,154 35,170 $827 192 $8,425 1,250 $3,861 199,200 $3,154
35,170
kWh
$827
192
kW-months/year
$8,425
1,250
MMBtu
$3,861
199,200
lb
TOTAL IMPLEMENTED Savings:
$16,267
Cost:
$19,122
$3,154 35,170 $827 192 $8,425 1,250 $3,861 199,200 $3,154
35,170
kWh
$827
192
kW-months/year
$8,425
1,250
MMBtu
$3,861
199,200
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)