IAC logo
IAC Assessment: SF0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Plastic Injection Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 13,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 2,800
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,326 483,587 kWh $0.09
Electricity Demand $8,985 2,160 kW-months/year $4.16
Natural Gas $851 100 MMBtu $8.51
TOTAL ENERGY COSTS $57,485
RECOMMENDED SAVINGS* $19,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,329
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$183
Cost:
$653
$146 1,758 $37 9 - - - - - - $146
1,758
kWh
$37
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,146
Cost:
$12,480
$2,556 28,429 $590 142 - - - - - - $2,556
28,429
kWh
$590
142
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,762
Cost:
$1,975
$2,016 22,567 $562 135 $(-816) (-109) - - - - $2,016
22,567
kWh
$562
135
kW-months/year
$(-816)
(-109)
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,296
Cost:
$8,880
$4,296 48,066 - - - - - - - - $4,296
48,066
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$10,370
Cost:
$500
- - - - - - $3,265 22,400 $7,105 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,265
22,400
lb
$7,105
-
$
TOTAL RECOMMENDED Savings:
$19,757
Cost:
$24,488
$9,014 100,820 $1,189 286 $(-816) (-109) $3,265 22,400 $7,105 - $9,014
100,820
kWh
$1,189
286
kW-months/year
$(-816)
(-109)
MMBtu
$3,265
22,400
lb
$7,105
-
$
TOTAL IMPLEMENTED Savings:
$3,329
Cost:
$13,133
$2,702 30,187 $627 151 - - - - - - $2,702
30,187
kWh
$627
151
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production