IAC logo
IAC Assessment: SF0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Stainless Steel Gas Panel Tubing Assemblies
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 47,000
Annual Production 720,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,954 1,939,332 kWh $0.09
Electricity Demand $12,832 2,969 kW-months/year $4.32
Natural Gas $1,561 192 MMBtu $8.13
TOTAL ENERGY COSTS $219,537
RECOMMENDED SAVINGS* $50,561 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,141
Cost:
$19,207
$17,141 140,094 - - - - - - $17,141
140,094
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,293
Cost:
$6,804
$16,188 132,474 - - $(-6,895) (-848) - - $16,188
132,474
kWh
-
-
kW-months/year
$(-6,895)
(-848)
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$725
Cost:
$595
$712 6,741 $13 3 - - - - $712
6,741
kWh
$13
3
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,216
Cost:
$2,840
$3,216 26,377 - - - - - - $3,216
26,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,017
Cost:
$6,950
$2,868 25,791 $149 116 - - - - $2,868
25,791
kWh
$149
116
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2514 COVER OPEN TANKS Savings:
$10,274
Cost:
$1,400
$10,274 84,115 - - - - - - $10,274
84,115
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,895
Cost:
$6,395
- - - - - - $6,895 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,895
-
lb
TOTAL RECOMMENDED Savings:
$50,561
Cost:
$44,191
$50,399 415,592 $162 119 $(-6,895) (-848) $6,895 - $50,399
415,592
kWh
$162
119
kW-months/year
$(-6,895)
(-848)
MMBtu
$6,895
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)