IAC logo
IAC Assessment: SF0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Wiring Devices
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 60,000
Annual Production 150,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,777 995,897 kWh $0.09
Electricity Demand $15,138 3,498 kW-months/year $4.33
Natural Gas $2,179 317 MMBtu $6.87
TOTAL ENERGY COSTS $121,233
RECOMMENDED SAVINGS* $9,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,849
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$583
Cost:
$775
$522 5,862 $61 14 - - $522
5,862
kWh
$61
14
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,328
Cost:
$3,864
$1,117 12,603 $211 49 - - $1,117
12,603
kWh
$211
49
kW-months/year
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,052
Cost:
$5,972
$1,052 11,723 - - - - $1,052
11,723
kWh
-
-
kW-months/year
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,077
Cost:
$1,530
$1,052 11,723 $25 6 - - $1,052
11,723
kWh
$25
6
kW-months/year
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,542
Cost:
-
$1,430 20,223 $112 32 - - $1,430
20,223
kWh
$112
32
kW-months/year
-
-
lb
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$722
Cost:
$2,520
$607 6,741 $115 26 - - $607
6,741
kWh
$115
26
kW-months/year
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,255
Cost:
$250
- - - - $3,255 - -
-
kWh
-
-
kW-months/year
$3,255
-
lb
TOTAL RECOMMENDED Savings:
$9,559
Cost:
$14,911
$5,780 68,875 $524 127 $3,255 - $5,780
68,875
kWh
$524
127
kW-months/year
$3,255
-
lb
TOTAL IMPLEMENTED Savings:
$5,849
Cost:
$6,222
$2,482 31,946 $112 32 $3,255 - $2,482
31,946
kWh
$112
32
kW-months/year
$3,255
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)