IAC logo
IAC Assessment: SF0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1996
Principal Product Cable Assembly
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 88,000
Annual Production 1,750,000 Pieces
Production Hrs. Annual 4,625
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,592 1,223,036 kWh $0.08
Electricity Demand $9,824 3,330 kW-months/year $2.95
Natural Gas $15,843 2,475 MMBtu $6.40
TOTAL ENERGY COSTS $135,102
RECOMMENDED SAVINGS* $14,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,768
Cost:
$13,765
$4,222 52,755 $546 185 - - $4,222
52,755
kWh
$546
185
kW-months/year
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$404
Cost:
$1,363
$367 4,689 $37 12 - - $367
4,689
kWh
$37
12
kW-months/year
-
-
lb
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$436
Cost:
$432
$436 5,275 - - - - $436
5,275
kWh
-
-
kW-months/year
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,529
Cost:
$2,040
$1,428 17,878 $101 34 - - $1,428
17,878
kWh
$101
34
kW-months/year
-
-
lb
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$5,147
Cost:
$1,432
$4,867 60,961 $280 90 - - $4,867
60,961
kWh
$280
90
kW-months/year
-
-
lb
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,658
Cost:
$250
- - - - $1,658 - -
-
kWh
-
-
kW-months/year
$1,658
-
lb
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$592
Cost:
$250
- - - - $592 - -
-
kWh
-
-
kW-months/year
$592
-
lb
TOTAL RECOMMENDED Savings:
$14,534
Cost:
$19,532
$11,320 141,558 $964 321 $2,250 - $11,320
141,558
kWh
$964
321
kW-months/year
$2,250
-
lb
TOTAL IMPLEMENTED Savings:
$14,534
Cost:
$19,532
$11,320 141,558 $964 321 $2,250 - $11,320
141,558
kWh
$964
321
kW-months/year
$2,250
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)