Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1996 |
Principal Product | Sugar-Based Candy |
NAICS | n/a |
SIC | 2064 - Candy & Other Confectionery Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $62,035 | 706,917 | kWh | $0.09 |
Electricity Demand | $12,692 | 2,813 | kW-months/year | $4.51 |
Natural Gas | $58,910 | 9,915 | MMBtu | $5.94 |
TOTAL ENERGY COSTS | $136,674 | |||
RECOMMENDED SAVINGS* | $16,292 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,292 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $3,884 Cost: $9,200 |
$3,884 | 44,256 | - | - | - | - | - | - | - | - |
$3,884 44,256 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,060 Cost: $250 |
- | - | - | - | $2,060 | 346 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,060 346 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $828 Cost: $150 |
$804 | 9,086 | $24 | 5 | - | - | - | - | - | - |
$804 9,086 kWh |
$24 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $590 Cost: $1,016 |
$496 | 5,569 | $94 | 21 | - | - | - | - | - | - |
$496 5,569 kWh |
$94 21 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $346 Cost: $308 |
- | - | - | - | $346 | 58 | - | - | - | - |
- - kWh |
- - kW-months/year |
$346 58 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $688 Cost: $889 |
$865 | 9,672 | $61 | 13 | $(-238) | (-40) | - | - | - | - |
$865 9,672 kWh |
$61 13 kW-months/year |
$(-238) (-40) MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $5,740 Cost: $780 |
- | - | - | - | - | - | $5,740 | 2,446,080 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,740 2,446,080 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,156 Cost: $250 |
- | - | - | - | - | - | - | - | $2,156 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,156 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,292 Cost: $12,843 |
$6,049 | 68,583 | $179 | 39 | $2,168 | 364 | $5,740 | 2,446,080 | $2,156 | - | $6,049 68,583 kWh |
$179 39 kW-months/year |
$2,168 364 MMBtu |
$5,740 2,446,080 Tgal |
$2,156 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,292 Cost: $12,843 |
$6,049 | 68,583 | $179 | 39 | $2,168 | 364 | $5,740 | 2,446,080 | $2,156 | - | $6,049 68,583 kWh |
$179 39 kW-months/year |
$2,168 364 MMBtu |
$5,740 2,446,080 Tgal |
$2,156 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) |