IAC logo
IAC Assessment: SF0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Metal Cabinet for Technology Companies
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 95
Plant Area (Sq.Ft.) 55,000
Annual Production 360,000 Tons
Production Hrs. Annual 5,096
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,912 890,094 kWh $0.08
Electricity Demand $12,435 2,867 kW-months/year $4.34
Natural Gas $4,584 765 MMBtu $5.99
TOTAL ENERGY COSTS $93,067
RECOMMENDED SAVINGS* $39,449 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,016
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$455
Cost:
$516
$395 4,689 $60 14 - - - - - - - - $395
4,689
kWh
$60
14
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,043
Cost:
-
$930 11,137 $113 26 - - - - - - - - $930
11,137
kWh
$113
26
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,131
Cost:
$20,040
$4,345 51,583 $786 181 - - - - - - - - $4,345
51,583
kWh
$786
181
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$498
Cost:
$1,232
$402 4,689 $96 22 - - - - - - - - $402
4,689
kWh
$96
22
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$390
Cost:
$250
- - - - - - $390 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$390
-
lb
-
-
$
-
-
$
06: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$5,935
Cost:
$5,245
- - - - $1,775 50 - - $4,160 - - - -
-
kWh
-
-
kW-months/year
$1,775
50
gal
-
-
lb
$4,160
-
$
-
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$25,000
Cost:
$1,600
- - - - - - - - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$25,000
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$997
Cost:
-
- - - - - - $3,597 43,982 $(-2,600) - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,597
43,982
lb
$(-2,600)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,449
Cost:
$28,883
$6,072 72,098 $1,055 243 $1,775 50 $3,987 43,982 $1,560 - $25,000 - $6,072
72,098
kWh
$1,055
243
kW-months/year
$1,775
50
gal
$3,987
43,982
lb
$1,560
-
$
$25,000
-
$
TOTAL IMPLEMENTED Savings:
$8,016
Cost:
$20,806
$5,670 67,409 $959 221 - - $3,987 43,982 $(-2,600) - - - $5,670
67,409
kWh
$959
221
kW-months/year
-
-
gal
$3,987
43,982
lb
$(-2,600)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Product