IAC Assessment: SF0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Laser Cut & Engraved Products
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 80,000
Annual Production 43,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $245,439 4,099,062 kWh $0.06
Electricity Demand $130,462 10,320 kW-months/year $12.64
Natural Gas $14,695 2,432 MMBtu $6.04
TOTAL ENERGY COSTS $470,157
RECOMMENDED SAVINGS* $797,507 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $783,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,708
Cost:
$30,720
$9,494 158,558 $4,214 333 - - - - - - $9,494
158,558
kWh
$4,214
333
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$871
Cost:
$514
$622 10,258 $249 20 - - - - - - $622
10,258
kWh
$249
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$812
Cost:
$3,000
$805 13,482 $7 1 - - - - - - $805
13,482
kWh
$7
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$354
Cost:
$845
$393 6,448 $114 9 $(-153) (-27) - - - - $393
6,448
kWh
$114
9
kW-months/year
$(-153)
(-27)
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,872
Cost:
$250
- - - - - - $1,872 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,872
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$250
Cost:
$250
- - - - - - $250 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$250
-
lb
-
-
$
07: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$779,640
Cost:
$275,000
- - - - - - - - $779,640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$779,640
-
$
TOTAL RECOMMENDED Savings:
$797,507
Cost:
$310,579
$11,314 188,746 $4,584 363 $(-153) (-27) $2,122 - $779,640 - $11,314
188,746
kWh
$4,584
363
kW-months/year
$(-153)
(-27)
MMBtu
$2,122
-
lb
$779,640
-
$
TOTAL IMPLEMENTED Savings:
$783,445
Cost:
$279,014
$1,427 23,740 $256 21 - - $2,122 - $779,640 - $1,427
23,740
kWh
$256
21
kW-months/year
-
-
MMBtu
$2,122
-
lb
$779,640
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes