Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1997 |
Principal Product | Corrugated Containers |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 128,000 |
Annual Production | 27,000 Thousand Feet |
Production Hrs. Annual | 2,340 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,280 | 328,839 | kWh | $0.09 |
Electricity Demand | $4,944 | 1,195 | kW-months/year | $4.14 |
Natural Gas | $880 | 128 | MMBtu | $6.88 |
TOTAL ENERGY COSTS | $53,771 | |||
RECOMMENDED SAVINGS* | $61,389 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,925 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,864 Cost: $7,560 |
$2,313 | 26,084 | $551 | 113 | - | - | - | - |
$2,313 26,084 kWh |
$551 113 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $105 Cost: $303 |
$85 | 879 | $20 | 5 | - | - | - | - |
$85 879 kWh |
$20 5 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $277 Cost: $677 |
$224 | 2,638 | $53 | 13 | - | - | - | - |
$224 2,638 kWh |
$53 13 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $1,187 Cost: $2,400 |
$959 | 10,844 | $228 | 55 | - | - | - | - |
$959 10,844 kWh |
$228 55 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $9,100 Cost: $250 |
- | - | - | - | $9,100 | - | - | - |
- - kWh |
- - kW-months/year |
$9,100 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,766 Cost: $18,000 |
- | - | - | - | $6,766 | - | - | - |
- - kWh |
- - kW-months/year |
$6,766 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $41,090 Cost: $6,912 |
- | - | - | - | - | - | $41,090 | - |
- - kWh |
- - kW-months/year |
- - lb |
$41,090 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,389 Cost: $36,102 |
$3,581 | 40,445 | $852 | 186 | $15,866 | - | $41,090 | - | $3,581 40,445 kWh |
$852 186 kW-months/year |
$15,866 - lb |
$41,090 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,925 Cost: $33,025 |
$2,398 | 26,963 | $571 | 118 | $15,866 | - | $41,090 | - | $2,398 26,963 kWh |
$571 118 kW-months/year |
$15,866 - lb |
$41,090 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |