IAC Assessment: SF0123
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0123
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1997
Principal Product Cooked & Dried Meat Products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 85,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 5,005
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,738 4,111,665 kWh $0.06
Electricity Demand $103,727 7,947 kW-months/year $13.05
Natural Gas $96,913 18,725 MMBtu $5.18
TOTAL ENERGY COSTS $524,179
RECOMMENDED SAVINGS* $147,532 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,567
Cost:
$25,020
$14,336 245,897 $5,231 401 - - - - - - - - $14,336
245,897
kWh
$5,231
401
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$8,269
Cost:
$19,750
$6,921 118,699 $1,348 103 - - - - - - - - $6,921
118,699
kWh
$1,348
103
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,606
Cost:
$1,680
$1,184 20,223 $422 32 - - - - - - - - $1,184
20,223
kWh
$422
32
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,784
Cost:
$3,010
- - - - $1,784 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,784
-
$
-
-
Tgal
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,656
Cost:
$204
$1,237 21,102 $419 32 - - - - - - - - $1,237
21,102
kWh
$419
32
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$790
Cost:
-
$518 8,792 $272 21 - - - - - - - - $518
8,792
kWh
$272
21
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,226
Cost:
$175
$1,205 20,809 $1,021 78 - - - - - - - - $1,205
20,809
kWh
$1,021
78
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$7,233
Cost:
$2,490
$(-1,489) (-25,498) - - - - $8,722 2,876,142 - - - - $(-1,489)
(-25,498)
kWh
-
-
kW-months/year
-
-
$
$8,722
2,876,142
Tgal
-
-
lb
-
-
$
09: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$4,893
Cost:
-
- - - - - - $4,893 1,201,615 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,893
1,201,615
Tgal
-
-
lb
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$24,394
Cost:
$250
- - - - - - - - $24,394 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$24,394
-
lb
-
-
$
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$21,040
Cost:
$11,500
- - - - - - - - - - $21,040 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$21,040
-
$
12: 4.422 UTILIZE OUTSIDE CONTRACTING Savings:
$54,074
Cost:
$250
- - - - - - - - - - $54,074 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$54,074
-
$
TOTAL RECOMMENDED Savings:
$147,532
Cost:
$64,329
$23,912 410,024 $8,713 667 $1,784 - $13,615 4,077,757 $24,394 - $75,114 - $23,912
410,024
kWh
$8,713
667
kW-months/year
$1,784
-
$
$13,615
4,077,757
Tgal
$24,394
-
lb
$75,114
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes