Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1998 |
Principal Product | Baked Goods |
NAICS | n/a |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 55,000,000 Pounds |
Production Hrs. Annual | 5,460 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $390,828 | 8,047,480 | kWh | $0.05 |
Electricity Demand | $202,630 | 16,036 | kW-months/year | $12.64 |
Natural Gas | $228,684 | 61,083 | MMBtu | $3.74 |
TOTAL ENERGY COSTS | $877,222 | |||
RECOMMENDED SAVINGS* | $84,905 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $70,647 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,778 Cost: - |
$1,004 | 20,809 | $774 | 61 | - | - | - | - | - | - | - | - | - | - |
$1,004 20,809 kWh |
$774 61 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,690 Cost: $1,675 |
$3,769 | 77,667 | $1,921 | 152 | - | - | - | - | - | - | - | - | - | - |
$3,769 77,667 kWh |
$1,921 152 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $622 Cost: $390 |
$396 | 8,206 | $226 | 18 | - | - | - | - | - | - | - | - | - | - |
$396 8,206 kWh |
$226 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,279 Cost: $2,814 |
$2,058 | 42,497 | $1,221 | 97 | - | - | - | - | - | - | - | - | - | - |
$2,058 42,497 kWh |
$1,221 97 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $14,457 Cost: $30,000 |
$13,335 | 274,619 | $1,122 | 89 | - | - | - | - | - | - | - | - | - | - |
$13,335 274,619 kWh |
$1,122 89 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $27,458 Cost: $71,304 |
$19,389 | 399,179 | $8,069 | 638 | - | - | - | - | - | - | - | - | - | - |
$19,389 399,179 kWh |
$8,069 638 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $3,216 Cost: $8,500 |
- | - | - | - | $3,216 | 859 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,216 859 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,339 Cost: $250 |
- | - | - | - | - | - | - | - | $2,339 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,339 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,634 Cost: $250 |
- | - | - | - | - | - | - | - | $2,634 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,634 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4155 METER WASTE WATER |
Savings: $5,934 Cost: $4,500 |
- | - | - | - | - | - | $5,934 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,934 - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.123 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING |
Savings: $17,498 Cost: $1,140 |
- | - | - | - | - | - | - | - | - | - | $4,498 | - | $13,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$4,498 - $ |
$13,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,905 Cost: $120,823 |
$39,951 | 822,977 | $13,333 | 1,055 | $3,216 | 859 | $5,934 | - | $4,973 | - | $4,498 | - | $13,000 | - | $39,951 822,977 kWh |
$13,333 1,055 kW-months/year |
$3,216 859 MMBtu |
$5,934 - Tgal |
$4,973 - lb |
$4,498 - $ |
$13,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $70,647 Cost: $114,398 |
$36,182 | 745,310 | $11,412 | 903 | $3,216 | 859 | - | - | $2,339 | - | $4,498 | - | $13,000 | - | $36,182 745,310 kWh |
$11,412 903 kW-months/year |
$3,216 859 MMBtu |
- - Tgal |
$2,339 - lb |
$4,498 - $ |
$13,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |