IAC logo
IAC Assessment: SF0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Custom Printed Material
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 249,600,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,659 2,387,163 kWh $0.07
Electricity Demand $68,463 6,819 kW-months/year $10.04
Natural Gas $31,226 5,478 MMBtu $5.70
TOTAL ENERGY COSTS $281,613
RECOMMENDED SAVINGS* $97,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,516
Cost:
$240
- - - - $10,516 - - - - - - - -
-
kWh
-
-
kW-months/year
$10,516
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,893
Cost:
$2,924
$4,309 61,254 $1,584 158 - - - - - - - - $4,309
61,254
kWh
$1,584
158
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,197
Cost:
$1,728
$1,507 21,395 $690 69 - - - - - - - - $1,507
21,395
kWh
$690
69
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,117
Cost:
$858
$902 12,896 $215 22 - - - - - - - - $902
12,896
kWh
$215
22
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,307
Cost:
$36,660
$20,091 286,049 $5,216 519 - - - - - - - - $20,091
286,049
kWh
$5,216
519
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,230
Cost:
$13,240
$6,694 95,252 $1,536 153 - - - - - - - - $6,694
95,252
kWh
$1,536
153
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$259
Cost:
$702
$155 2,345 $104 11 - - - - - - - - $155
2,345
kWh
$104
11
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$5,866
Cost:
-
- - - - - - - - $5,866 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$5,866
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,642
Cost:
$200
- - - - - - - - $3,642 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,642
-
lb
-
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,861
Cost:
$8,700
- - - - - - - - $7,861 46,720 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$7,861
46,720
lb
-
-
$
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$12,856
Cost:
$10,280
- - - - - - - - $12,856 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$12,856
-
lb
-
-
$
12: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$13,860
Cost:
$40,000
- - - - - - $6,160 1,540 - - $7,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,160
1,540
gal
-
-
lb
$7,700
-
$
TOTAL RECOMMENDED Savings:
$97,604
Cost:
$115,532
$33,658 479,191 $9,345 932 $10,516 - $6,160 1,540 $30,225 46,720 $7,700 - $33,658
479,191
kWh
$9,345
932
kW-months/year
$10,516
-
MMBtu
$6,160
1,540
gal
$30,225
46,720
lb
$7,700
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Primary Raw Material