IAC logo
IAC Assessment: SF0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Cans/Ends
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 394,113
Annual Production 300,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $433,461 7,937,866 kWh $0.05
Electricity Demand $193,897 15,221 kW-months/year $12.74
Natural Gas $421,834 106,301 MMBtu $3.97
TOTAL ENERGY COSTS $527,910
RECOMMENDED SAVINGS* $574,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,726
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,737
Cost:
-
$1,737 6,155 - - - - - - - - $1,737
6,155
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$555
Cost:
$349
$555 10,258 - - - - - - - - $555
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,271
Cost:
$2,284
$2,381 42,497 $890 70 - - - - - - $2,381
42,497
kWh
$890
70
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,199
Cost:
$1,000
$575 10,551 $624 49 - - - - - - $575
10,551
kWh
$624
49
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,711
Cost:
$2,464
$1,145 21,102 $566 44 - - - - - - $1,145
21,102
kWh
$566
44
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,122
Cost:
$1,600
$920 16,999 $202 16 - - - - - - $920
16,999
kWh
$202
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,821
Cost:
$7,370
$3,521 64,478 $1,300 104 - - - - - - $3,521
64,478
kWh
$1,300
104
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,993
Cost:
$4,500
$2,181 39,859 $812 63 - - - - - - $2,181
39,859
kWh
$812
63
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,253
Cost:
$17,610
$7,198 131,887 $3,055 240 - - - - - - $7,198
131,887
kWh
$3,055
240
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$76,331
Cost:
$262,000
$116,032 2,125,147 $43,388 3,406 $(-83,089) (-20,929) - - - - $116,032
2,125,147
kWh
$43,388
3,406
kW-months/year
$(-83,089)
(-20,929)
MMBtu
-
-
lb
-
-
$
11: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,974
Cost:
-
- - - - - - $3,974 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,974
-
lb
-
-
$
12: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,575
Cost:
-
- - - - - - $3,575 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,575
-
lb
-
-
$
13: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$48,140
Cost:
$30,000
- - - - - - $48,140 106,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$48,140
106,000
lb
-
-
$
14: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$207,480
Cost:
$100,700
- - - - - - - - $207,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$207,480
-
$
15: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$207,480
Cost:
$100,000
- - - - - - - - $207,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$207,480
-
$
TOTAL RECOMMENDED Savings:
$574,642
Cost:
$529,877
$136,245 2,468,933 $50,837 3,992 $(-83,089) (-20,929) $55,689 106,000 $414,960 - $136,245
2,468,933
kWh
$50,837
3,992
kW-months/year
$(-83,089)
(-20,929)
MMBtu
$55,689
106,000
lb
$414,960
-
$
TOTAL IMPLEMENTED Savings:
$18,726
Cost:
$23,707
$13,591 222,450 $5,135 403 - - - - - - $13,591
222,450
kWh
$5,135
403
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes