IAC logo
IAC Assessment: SF0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Stoves
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 65,000
Annual Production 5,500 Pieces
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,453 782,825 kWh $0.08
Electricity Demand $14,162 3,312 kW-months/year $4.28
Natural Gas $11,984 2,289 MMBtu $5.24
TOTAL ENERGY COSTS $96,672
RECOMMENDED SAVINGS* $278,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,691
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$731
Cost:
$22
$651 7,913 $80 19 - - - - $651
7,913
kWh
$80
19
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$328
Cost:
$430
$261 3,224 $67 16 - - - - $261
3,224
kWh
$67
16
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,624
Cost:
$9,930
$2,107 26,084 $517 121 - - - - $2,107
26,084
kWh
$517
121
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,807
Cost:
$13,260
$3,824 47,186 $983 230 - - - - $3,824
47,186
kWh
$983
230
kW-months/year
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,768
Cost:
-
- - - - $1,768 - - - -
-
kWh
-
-
kW-months/year
$1,768
-
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$32,308
Cost:
$300
- - - - $32,308 - - - -
-
kWh
-
-
kW-months/year
$32,308
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,556
Cost:
$300
- - - - $2,556 - - - -
-
kWh
-
-
kW-months/year
$2,556
-
lb
-
-
$
08: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$14,820
Cost:
-
- - - - - - $14,820 - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,820
-
$
09: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$27,108
Cost:
$1,200
- - - - - - $27,108 - -
-
kWh
-
-
kW-months/year
-
-
lb
$27,108
-
$
10: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$105,533
Cost:
$72,440
- - - - - - $105,533 - -
-
kWh
-
-
kW-months/year
-
-
lb
$105,533
-
$
11: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$86,019
Cost:
$300,440
- - - - - - $86,019 - -
-
kWh
-
-
kW-months/year
-
-
lb
$86,019
-
$
TOTAL RECOMMENDED Savings:
$278,602
Cost:
$398,322
$6,843 84,407 $1,647 386 $36,632 - $233,480 - $6,843
84,407
kWh
$1,647
386
kW-months/year
$36,632
-
lb
$233,480
-
$
TOTAL IMPLEMENTED Savings:
$37,691
Cost:
$1,052
$912 11,137 $147 35 $36,632 - - - $912
11,137
kWh
$147
35
kW-months/year
$36,632
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes