IAC logo
IAC Assessment: SF0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Candy
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 38,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,905 222,743 kWh $0.08
Electricity Demand $4,313 1,045 kW-months/year $4.13
Natural Gas $40,160 6,640 MMBtu $6.05
TOTAL ENERGY COSTS $73,829
RECOMMENDED SAVINGS* $10,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,504
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,822
Cost:
$600
- - - - $3,822 632 - - - - -
-
kWh
-
-
kW-months/year
$3,822
632
MMBtu
-
-
lb
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$565
Cost:
$560
- - - - $565 94 - - - - -
-
kWh
-
-
kW-months/year
$565
94
MMBtu
-
-
lb
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$563
Cost:
$575
$563 5,862 - - - - - - - - $563
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$713
Cost:
$4,745
$139 26,964 $574 139 - - - - - - $139
26,964
kWh
$574
139
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$182
Cost:
$513
$144 1,758 $38 9 - - - - - - $144
1,758
kWh
$38
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$336
Cost:
$1,456
$266 3,224 $70 17 - - - - - - $266
3,224
kWh
$70
17
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$862
Cost:
-
- - - - - - $862 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$862
-
lb
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$360
Cost:
$115
- - - - - - $360 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$360
-
lb
-
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$3,099
Cost:
$3,615
- - - - - - - - $3,099 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,099
-
$
TOTAL RECOMMENDED Savings:
$10,502
Cost:
$12,179
$1,112 37,808 $682 165 $4,387 726 $1,222 - $3,099 - $1,112
37,808
kWh
$682
165
kW-months/year
$4,387
726
MMBtu
$1,222
-
lb
$3,099
-
$
TOTAL IMPLEMENTED Savings:
$6,504
Cost:
$6,533
$283 28,722 $612 148 $4,387 726 $1,222 - - - $283
28,722
kWh
$612
148
kW-months/year
$4,387
726
MMBtu
$1,222
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $