Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1998 |
Principal Product | Candy |
NAICS | n/a |
SIC | 2064 - Candy & Other Confectionery Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 2,340 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $17,905 | 222,743 | kWh | $0.08 |
Electricity Demand | $4,313 | 1,045 | kW-months/year | $4.13 |
Natural Gas | $40,160 | 6,640 | MMBtu | $6.05 |
TOTAL ENERGY COSTS | $73,829 | |||
RECOMMENDED SAVINGS* | $10,502 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,504 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $3,822 Cost: $600 |
- | - | - | - | $3,822 | 632 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,822 632 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $565 Cost: $560 |
- | - | - | - | $565 | 94 | - | - | - | - |
- - kWh |
- - kW-months/year |
$565 94 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $563 Cost: $575 |
$563 | 5,862 | - | - | - | - | - | - | - | - |
$563 5,862 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $713 Cost: $4,745 |
$139 | 26,964 | $574 | 139 | - | - | - | - | - | - |
$139 26,964 kWh |
$574 139 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $182 Cost: $513 |
$144 | 1,758 | $38 | 9 | - | - | - | - | - | - |
$144 1,758 kWh |
$38 9 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $336 Cost: $1,456 |
$266 | 3,224 | $70 | 17 | - | - | - | - | - | - |
$266 3,224 kWh |
$70 17 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $862 Cost: - |
- | - | - | - | - | - | $862 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$862 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $360 Cost: $115 |
- | - | - | - | - | - | $360 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$360 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $3,099 Cost: $3,615 |
- | - | - | - | - | - | - | - | $3,099 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,099 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,502 Cost: $12,179 |
$1,112 | 37,808 | $682 | 165 | $4,387 | 726 | $1,222 | - | $3,099 | - | $1,112 37,808 kWh |
$682 165 kW-months/year |
$4,387 726 MMBtu |
$1,222 - lb |
$3,099 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,504 Cost: $6,533 |
$283 | 28,722 | $612 | 148 | $4,387 | 726 | $1,222 | - | - | - | $283 28,722 kWh |
$612 148 kW-months/year |
$4,387 726 MMBtu |
$1,222 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |