IAC Assessment: SF0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1998
Principal Product Tomato Paste
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 1,219,680
Annual Production 60,000,000 Pounds
Production Hrs. Annual 2,016
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,905 5,410,610 kWh $0.05
Electricity Demand $199,687 11,260 kW-months/year $17.73
Natural Gas $840,808 252,710 MMBtu $3.33
TOTAL ENERGY COSTS $1,353,305
RECOMMENDED SAVINGS* $166,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,782
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$3,242
Cost:
-
- - - - $3,242 1,215 -
-
kWh
-
-
kW-months/year
$3,242
1,215
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$112,256
Cost:
$73,966
$38,290 722,157 $73,966 4,171 - - $38,290
722,157
kWh
$73,966
4,171
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,646
Cost:
$4,900
$1,886 35,463 $3,760 212 - - $1,886
35,463
kWh
$3,760
212
kW-months/year
-
-
MMBtu
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$15,577
Cost:
$17,000
- - - - $15,577 4,682 -
-
kWh
-
-
kW-months/year
$15,577
4,682
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,270
Cost:
$17,928
$4,103 77,374 $8,167 461 - - $4,103
77,374
kWh
$8,167
461
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,837
Cost:
$5,310
$961 18,171 $2,876 108 - - $961
18,171
kWh
$2,876
108
kW-months/year
-
-
MMBtu
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,288
Cost:
$6,477
- - - - $3,288 989 -
-
kWh
-
-
kW-months/year
$3,288
989
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,681
Cost:
$9,290
$1,475 29,015 $2,206 124 - - $1,475
29,015
kWh
$2,206
124
kW-months/year
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,664
Cost:
$4,281
$561 10,551 $1,103 63 - - $561
10,551
kWh
$1,103
63
kW-months/year
-
-
MMBtu
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,549
Cost:
$9,500
$521 9,672 $1,028 58 - - $521
9,672
kWh
$1,028
58
kW-months/year
-
-
MMBtu
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,965
Cost:
$24,395
$1,323 24,912 $2,642 149 - - $1,323
24,912
kWh
$2,642
149
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$166,975
Cost:
$173,047
$49,120 927,315 $95,748 5,346 $22,107 6,886 $49,120
927,315
kWh
$95,748
5,346
kW-months/year
$22,107
6,886
MMBtu
TOTAL IMPLEMENTED Savings:
$15,782
Cost:
$27,971
$4,443 84,701 $8,097 457 $3,242 1,215 $4,443
84,701
kWh
$8,097
457
kW-months/year
$3,242
1,215
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas