IAC logo
IAC Assessment: SF0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Bleach, Chlorine
NAICS n/a
SIC 2812 - Alkalies And Chlorine
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 68,000
Annual Production 12,000 Thousand Gallons
Production Hrs. Annual 6,552
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,239 1,046,014 kWh $0.08
Electricity Demand $12,363 1,433 kW-months/year $8.63
Natural Gas $2,783 399 MMBtu $6.97
TOTAL ENERGY COSTS $109,190
RECOMMENDED SAVINGS* $19,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,474
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$615
Cost:
-
$615 7,620 - - $615
7,620
kWh
-
-
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,561
Cost:
$2,700
$6,824 84,115 $737 171 $6,824
84,115
kWh
$737
171
kW-months/year
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$453
Cost:
$291
$413 4,982 $40 9 $413
4,982
kWh
$40
9
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,921
Cost:
$3,189
$3,242 39,859 $679 97 $3,242
39,859
kWh
$679
97
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,105
Cost:
$1,008
$1,006 12,309 $99 23 $1,006
12,309
kWh
$99
23
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,910
Cost:
$8,190
$2,641 32,532 $269 63 $2,641
32,532
kWh
$269
63
kW-months/year
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,025
Cost:
$6,000
$1,769 21,688 $256 60 $1,769
21,688
kWh
$256
60
kW-months/year
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,014
Cost:
$4,121
$905 11,137 $109 25 $905
11,137
kWh
$109
25
kW-months/year
TOTAL RECOMMENDED Savings:
$19,604
Cost:
$25,499
$17,415 214,242 $2,189 448 $17,415
214,242
kWh
$2,189
448
kW-months/year
TOTAL IMPLEMENTED Savings:
$16,474
Cost:
$18,491
$14,640 180,245 $1,834 365 $14,640
180,245
kWh
$1,834
365
kW-months/year