Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1999 |
Principal Product | Packaging Foam |
NAICS | n/a |
SIC | 3086 - Plastics Foam Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $150,578 | 2,589,390 | kWh | $0.06 |
Electricity Demand | $73,592 | 5,866 | kW-months/year | $12.55 |
Natural Gas | $215,420 | 64,487 | MMBtu | $3.34 |
TOTAL ENERGY COSTS | $453,306 | |||
RECOMMENDED SAVINGS* | $44,275 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,886 Cost: $1,618 |
$4,886 | 84,115 | - | - | - | - | - | - | - | - |
$4,886 84,115 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $278 Cost: $125 |
- | - | - | - | $278 | 83 | - | - | - | - |
- - kWh |
- - kW-months/year |
$278 83 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,460 Cost: $896 |
$1,020 | 17,585 | $440 | 36 | - | - | - | - | - | - |
$1,020 17,585 kWh |
$440 36 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,384 Cost: $981 |
$967 | 16,706 | $417 | 33 | - | - | - | - | - | - |
$967 16,706 kWh |
$417 33 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $6,137 Cost: $4,800 |
$4,292 | 73,857 | $1,845 | 147 | - | - | - | - | - | - |
$4,292 73,857 kWh |
$1,845 147 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,717 Cost: $2,424 |
$1,169 | 20,223 | $548 | 44 | - | - | - | - | - | - |
$1,169 20,223 kWh |
$548 44 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,244 Cost: $4,080 |
$805 | 13,775 | $439 | 35 | - | - | - | - | - | - |
$805 13,775 kWh |
$439 35 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $1,899 Cost: $6,500 |
$1,146 | 19,637 | $753 | 60 | - | - | - | - | - | - |
$1,146 19,637 kWh |
$753 60 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $631 Cost: $2,500 |
- | - | - | - | $631 | 189 | - | - | - | - |
- - kWh |
- - kW-months/year |
$631 189 MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $2,233 Cost: - |
- | - | - | - | - | - | - | - | $2,233 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,233 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $6,780 Cost: $8,175 |
- | - | - | - | - | - | - | - | $6,780 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$6,780 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $994 Cost: $371 |
$(-128) | (-1,465) | - | - | - | - | $1,122 | 249,600 | - | - |
$(-128) (-1,465) kWh |
- - kW-months/year |
- - MMBtu |
$1,122 249,600 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
Savings: $14,632 Cost: $53,728 |
$10,234 | 527,550 | $4,398 | 350 | - | - | - | - | - | - |
$10,234 527,550 kWh |
$4,398 350 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,275 Cost: $86,198 |
$24,391 | 771,983 | $8,840 | 705 | $909 | 272 | $1,122 | 249,600 | $9,013 | - | $24,391 771,983 kWh |
$8,840 705 kW-months/year |
$909 272 MMBtu |
$1,122 249,600 Tgal |
$9,013 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) |