IAC logo
IAC Assessment: SF0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Packaging Foam
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 90,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,578 2,589,390 kWh $0.06
Electricity Demand $73,592 5,866 kW-months/year $12.55
Natural Gas $215,420 64,487 MMBtu $3.34
TOTAL ENERGY COSTS $453,306
RECOMMENDED SAVINGS* $44,275 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,886
Cost:
$1,618
$4,886 84,115 - - - - - - - - $4,886
84,115
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$278
Cost:
$125
- - - - $278 83 - - - - -
-
kWh
-
-
kW-months/year
$278
83
MMBtu
-
-
Tgal
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,460
Cost:
$896
$1,020 17,585 $440 36 - - - - - - $1,020
17,585
kWh
$440
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,384
Cost:
$981
$967 16,706 $417 33 - - - - - - $967
16,706
kWh
$417
33
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,137
Cost:
$4,800
$4,292 73,857 $1,845 147 - - - - - - $4,292
73,857
kWh
$1,845
147
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,717
Cost:
$2,424
$1,169 20,223 $548 44 - - - - - - $1,169
20,223
kWh
$548
44
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,244
Cost:
$4,080
$805 13,775 $439 35 - - - - - - $805
13,775
kWh
$439
35
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,899
Cost:
$6,500
$1,146 19,637 $753 60 - - - - - - $1,146
19,637
kWh
$753
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
09: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$631
Cost:
$2,500
- - - - $631 189 - - - - -
-
kWh
-
-
kW-months/year
$631
189
MMBtu
-
-
Tgal
-
-
lb
10: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$2,233
Cost:
-
- - - - - - - - $2,233 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,233
-
lb
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,780
Cost:
$8,175
- - - - - - - - $6,780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$6,780
-
lb
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$994
Cost:
$371
$(-128) (-1,465) - - - - $1,122 249,600 - - $(-128)
(-1,465)
kWh
-
-
kW-months/year
-
-
MMBtu
$1,122
249,600
Tgal
-
-
lb
13: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$14,632
Cost:
$53,728
$10,234 527,550 $4,398 350 - - - - - - $10,234
527,550
kWh
$4,398
350
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$44,275
Cost:
$86,198
$24,391 771,983 $8,840 705 $909 272 $1,122 249,600 $9,013 - $24,391
771,983
kWh
$8,840
705
kW-months/year
$909
272
MMBtu
$1,122
249,600
Tgal
$9,013
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb