Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 1999 |
Principal Product | Bakers Yeast |
NAICS | n/a |
SIC | 2053 - Frozen Bakery Products, Except Bread |
Sales | $10,000,000-$50,000,000 |
# of Employees | 97 |
Plant Area (Sq.Ft.) | 132,000 |
Annual Production | 70,000,000 Pounds |
Production Hrs. Annual | 6,864 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $741,045 | 15,072,099 | kWh | $0.05 |
Electricity Demand | $372,828 | 34,521 | kW-months/year | $10.80 |
Natural Gas | $264,498 | 88,625 | MMBtu | $2.98 |
TOTAL ENERGY COSTS | $3,504,763 | |||
RECOMMENDED SAVINGS* | $436,558 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $226,916 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $7,540 Cost: - |
- | - | - | - | $7,540 | 2,795 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,540 2,795 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,924 Cost: $1,958 |
$5,003 | 101,700 | $1,921 | 178 | - | - | - | - | - | - | - | - |
$5,003 101,700 kWh |
$1,921 178 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,121 Cost: $825 |
- | - | - | - | $1,121 | 375 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,121 375 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,054 Cost: $1,800 |
$1,434 | 29,015 | $620 | 57 | - | - | - | - | - | - | - | - |
$1,434 29,015 kWh |
$620 57 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,100 Cost: $15,856 |
$10,416 | 205,158 | $1,684 | 156 | - | - | - | - | - | - | - | - |
$10,416 205,158 kWh |
$1,684 156 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $124,530 Cost: $236,733 |
$89,957 | 1,829,719 | $34,573 | 3,199 | - | - | - | - | - | - | - | - |
$89,957 1,829,719 kWh |
$34,573 3,199 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,368 Cost: $7,209 |
$3,156 | 64,185 | $1,212 | 112 | - | - | - | - | - | - | - | - |
$3,156 64,185 kWh |
$1,212 112 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,548 Cost: $14,600 |
$4,010 | 81,477 | $2,538 | 235 | - | - | - | - | - | - | - | - |
$4,010 81,477 kWh |
$2,538 235 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,448 Cost: $21,777 |
- | - | - | - | $8,448 | 2,831 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,448 2,831 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $5,543 Cost: $21,500 |
$4,005 | 81,477 | $1,538 | 142 | - | - | - | - | - | - | - | - |
$4,005 81,477 kWh |
$1,538 142 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $960 Cost: - |
- | - | - | - | - | - | - | - | $960 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$960 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $10,400 Cost: - |
- | - | - | - | - | - | - | - | $10,400 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$10,400 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,632 Cost: $250 |
- | - | - | - | - | - | - | - | $1,632 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$1,632 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT |
Savings: $138,720 Cost: $11,500 |
- | - | - | - | - | - | - | - | - | - | $138,720 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$138,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT |
Savings: $1,726 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,726 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$1,726 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT |
Savings: $44,655 Cost: $23,000 |
- | - | - | - | - | - | - | - | - | - | $44,655 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$44,655 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,752 Cost: $9,602 |
- | - | - | - | - | - | - | - | - | - | $3,752 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$3,752 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $55,537 Cost: $10,830 |
- | - | - | - | - | - | $55,537 | 25,350,590 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$55,537 25,350,590 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $436,558 Cost: $377,440 |
$117,981 | 2,392,731 | $44,086 | 4,079 | $17,109 | 6,001 | $55,537 | 25,350,590 | $12,992 | - | $188,853 | - | $117,981 2,392,731 kWh |
$44,086 4,079 kW-months/year |
$17,109 6,001 MMBtu |
$55,537 25,350,590 Tgal |
$12,992 - lb |
$188,853 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $226,916 Cost: $68,069 |
$9,593 | 194,900 | $3,753 | 347 | $17,109 | 6,001 | - | - | $11,360 | - | $185,101 | - | $9,593 194,900 kWh |
$3,753 347 kW-months/year |
$17,109 6,001 MMBtu |
- - Tgal |
$11,360 - lb |
$185,101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |