IAC logo
IAC Assessment: SF0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Bakers Yeast
NAICS n/a
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 132,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $741,045 15,072,099 kWh $0.05
Electricity Demand $372,828 34,521 kW-months/year $10.80
Natural Gas $264,498 88,625 MMBtu $2.98
TOTAL ENERGY COSTS $3,504,763
RECOMMENDED SAVINGS* $436,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $226,916
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$7,540
Cost:
-
- - - - $7,540 2,795 - - - - - - -
-
kWh
-
-
kW-months/year
$7,540
2,795
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,924
Cost:
$1,958
$5,003 101,700 $1,921 178 - - - - - - - - $5,003
101,700
kWh
$1,921
178
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,121
Cost:
$825
- - - - $1,121 375 - - - - - - -
-
kWh
-
-
kW-months/year
$1,121
375
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,054
Cost:
$1,800
$1,434 29,015 $620 57 - - - - - - - - $1,434
29,015
kWh
$620
57
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,100
Cost:
$15,856
$10,416 205,158 $1,684 156 - - - - - - - - $10,416
205,158
kWh
$1,684
156
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$124,530
Cost:
$236,733
$89,957 1,829,719 $34,573 3,199 - - - - - - - - $89,957
1,829,719
kWh
$34,573
3,199
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,368
Cost:
$7,209
$3,156 64,185 $1,212 112 - - - - - - - - $3,156
64,185
kWh
$1,212
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,548
Cost:
$14,600
$4,010 81,477 $2,538 235 - - - - - - - - $4,010
81,477
kWh
$2,538
235
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,448
Cost:
$21,777
- - - - $8,448 2,831 - - - - - - -
-
kWh
-
-
kW-months/year
$8,448
2,831
MMBtu
-
-
Tgal
-
-
lb
-
-
$
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$5,543
Cost:
$21,500
$4,005 81,477 $1,538 142 - - - - - - - - $4,005
81,477
kWh
$1,538
142
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
11: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$960
Cost:
-
- - - - - - - - $960 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$960
-
lb
-
-
$
12: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$10,400
Cost:
-
- - - - - - - - $10,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,400
-
lb
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,632
Cost:
$250
- - - - - - - - $1,632 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,632
-
lb
-
-
$
14: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$138,720
Cost:
$11,500
- - - - - - - - - - $138,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$138,720
-
$
15: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$1,726
Cost:
-
- - - - - - - - - - $1,726 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$1,726
-
$
16: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$44,655
Cost:
$23,000
- - - - - - - - - - $44,655 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$44,655
-
$
17: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,752
Cost:
$9,602
- - - - - - - - - - $3,752 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$3,752
-
$
18: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$55,537
Cost:
$10,830
- - - - - - $55,537 25,350,590 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$55,537
25,350,590
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$436,558
Cost:
$377,440
$117,981 2,392,731 $44,086 4,079 $17,109 6,001 $55,537 25,350,590 $12,992 - $188,853 - $117,981
2,392,731
kWh
$44,086
4,079
kW-months/year
$17,109
6,001
MMBtu
$55,537
25,350,590
Tgal
$12,992
-
lb
$188,853
-
$
TOTAL IMPLEMENTED Savings:
$226,916
Cost:
$68,069
$9,593 194,900 $3,753 347 $17,109 6,001 - - $11,360 - $185,101 - $9,593
194,900
kWh
$3,753
347
kW-months/year
$17,109
6,001
MMBtu
-
-
Tgal
$11,360
-
lb
$185,101
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes