IAC logo
IAC Assessment: SF0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Rigid Foam Insulation
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 38
Plant Area (Sq.Ft.) 875,560
Annual Production 34,000 Thousand Feet
Production Hrs. Annual 2,253
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,160 1,355,510 kWh $0.05
Electricity Demand $57,041 5,358 kW-months/year $10.65
Natural Gas $33,255 6,025 MMBtu $5.52
TOTAL ENERGY COSTS $279,770
RECOMMENDED SAVINGS* $93,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,465
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,862
Cost:
$3,899
$6,654 126,612 $7,189 675 $(-2,981) (-540) - - - - $6,654
126,612
kWh
$7,189
675
kW-months/year
$(-2,981)
(-540)
MMBtu
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$600
Cost:
$364
$288 5,569 $312 30 - - - - - - $288
5,569
kWh
$312
30
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$39,185
Cost:
$52,900
$24,011 457,503 $25,943 203 $(-10,769) (-1,951) - - - - $24,011
457,503
kWh
$25,943
203
kW-months/year
$(-10,769)
(-1,951)
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$588
Cost:
$1,949
$283 5,275 $305 29 - - - - - - $283
5,275
kWh
$305
29
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$604
Cost:
-
- - - - - - $604 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$604
-
lb
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$29,453
Cost:
$34,995
- - - - - - $29,453 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$29,453
-
lb
-
-
$
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,673
Cost:
-
- - - - - - - - $1,673 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,673
-
$
08: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$9,463
Cost:
$4,000
- - - - - - - - $9,463 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$9,463
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,062
Cost:
$1,729
- - - - - - - - $1,062 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,062
-
$
TOTAL RECOMMENDED Savings:
$93,490
Cost:
$99,836
$31,236 594,959 $33,749 937 $(-13,750) (-2,491) $30,057 - $12,198 - $31,236
594,959
kWh
$33,749
937
kW-months/year
$(-13,750)
(-2,491)
MMBtu
$30,057
-
lb
$12,198
-
$
TOTAL IMPLEMENTED Savings:
$3,465
Cost:
$2,313
$571 10,844 $617 59 - - $604 - $1,673 - $571
10,844
kWh
$617
59
kW-months/year
-
-
MMBtu
$604
-
lb
$1,673
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes