Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Tempered Glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 106
Plant Area (Sq.Ft.) 80,000
Annual Production 3,000 Thousand Feet
Production Hrs. Annual 7,752
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,088 4,916,764 kWh $0.06
Electricity Demand $144,577 11,380 kW-months/year $12.70
Natural Gas $1,421 210 MMBtu $6.77
TOTAL ENERGY COSTS $438,913
RECOMMENDED SAVINGS* $1,906,479 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,539,027
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,293
Cost:
$3,150
$5,451 93,787 $1,842 145 - - - - - - - - $5,451
93,787
kWh
$1,842
145
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,834
Cost:
$3,195
$8,120 139,508 $2,743 216 $(-4,029) (-595) - - - - - - $8,120
139,508
kWh
$2,743
216
kW-months/year
$(-4,029)
(-595)
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$769
Cost:
$466
$575 9,965 $194 15 - - - - - - - - $575
9,965
kWh
$194
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,740
Cost:
$1,817
$2,048 35,170 $692 54 - - - - - - - - $2,048
35,170
kWh
$692
54
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$88,190
Cost:
$133,150
$65,919 1,132,767 $22,271 1,754 - - - - - - - - $65,919
1,132,767
kWh
$22,271
1,754
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,802
Cost:
$14,510
$6,514 111,958 $2,288 180 - - - - - - - - $6,514
111,958
kWh
$2,288
180
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,413
Cost:
-
- - - - - - $1,413 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,413
-
lb
-
-
$
-
-
$
08: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$821,093
Cost:
$48,500
- - - - - - - - $821,093 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$821,093
-
$
-
-
$
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$131,976
Cost:
$10,000
- - - - - - - - $131,976 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$131,976
-
$
-
-
$
10: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$574,512
Cost:
$43,227
- - - - - - - - $55,812 - $518,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$55,812
-
$
$518,700
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$54,584
Cost:
$130,000
- - - - - - - - $54,584 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$54,584
-
$
-
-
$
12: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$110,720
Cost:
$322,185
$202,990 3,488,570 $68,580 5,400 $(-160,850) (-32,171) - - - - - - $202,990
3,488,570
kWh
$68,580
5,400
kW-months/year
$(-160,850)
(-32,171)
MMBtu
-
-
lb
-
-
$
-
-
$
13: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$97,553
Cost:
$950,000
$90,218 1,550,410 $30,480 2,400 $(-23,145) (-4,629) - - - - - - $90,218
1,550,410
kWh
$30,480
2,400
kW-months/year
$(-23,145)
(-4,629)
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,906,479
Cost:
$1,660,200
$381,835 6,562,135 $129,090 10,164 $(-188,024) (-37,395) $1,413 - $1,063,465 - $518,700 - $381,835
6,562,135
kWh
$129,090
10,164
kW-months/year
$(-188,024)
(-37,395)
MMBtu
$1,413
-
lb
$1,063,465
-
$
$518,700
-
$
TOTAL IMPLEMENTED Savings:
$1,539,027
Cost:
$106,694
$7,499 128,957 $2,534 199 - - $1,413 - $1,008,881 - $518,700 - $7,499
128,957
kWh
$2,534
199
kW-months/year
-
-
MMBtu
$1,413
-
lb
$1,008,881
-
$
$518,700
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product