IAC Assessment: SF0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1999
Principal Product Peppers, Olives, and Specialties
NAICS n/a
SIC 2014 -
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 80,000
Annual Production 2,000,000 Units
Production Hrs. Annual 3,168
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,324 863,130 kWh $0.08
Electricity Demand $11,100 2,592 kW-months/year $4.28
Natural Gas $72,896 15,357 MMBtu $4.75
TOTAL ENERGY COSTS $186,652
RECOMMENDED SAVINGS* $45,299 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,303
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,431
Cost:
-
- - - - $1,431 470 - - - - - - -
-
kWh
-
-
kW-months/year
$1,431
470
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$850
Cost:
$788
- - - - $850 180 - - - - - - -
-
kWh
-
-
kW-months/year
$850
180
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$442
Cost:
$600
$375 4,689 $67 16 - - - - - - - - $375
4,689
kWh
$67
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,772
Cost:
$16,500
$6,016 73,857 $756 177 - - - - - - - - $6,016
73,857
kWh
$756
177
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,556
Cost:
$14,000
$3,158 38,687 $398 93 - - - - - - - - $3,158
38,687
kWh
$398
93
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$240
Cost:
$200
- - - - - - - - $240 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$240
-
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$10,000
Cost:
$200
- - - - - - - - $10,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,000
-
lb
-
-
$
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$7,184
Cost:
$3,721
- - - - - - $7,184 1,020,680 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,184
1,020,680
Tgal
-
-
lb
-
-
$
09: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$3,340
Cost:
$3,269
- - - - - - $3,340 383,130 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,340
383,130
Tgal
-
-
lb
-
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,484
Cost:
$15,374
$(-30) (-293) - - - - - - $12,014 - $(-500) - $(-30)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$12,014
-
lb
$(-500)
-
$
TOTAL RECOMMENDED Savings:
$45,299
Cost:
$54,652
$9,519 116,940 $1,221 286 $2,281 650 $10,524 1,403,810 $22,254 - $(-500) - $9,519
116,940
kWh
$1,221
286
kW-months/year
$2,281
650
MMBtu
$10,524
1,403,810
Tgal
$22,254
-
lb
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$16,303
Cost:
$5,057
$375 4,689 $67 16 $2,281 650 $3,340 383,130 $10,240 - - - $375
4,689
kWh
$67
16
kW-months/year
$2,281
650
MMBtu
$3,340
383,130
Tgal
$10,240
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes