IAC logo
IAC Assessment: SF0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2000
Principal Product Sheet Metal
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 4,550
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,668 894,600 kWh $0.08
Natural Gas $75,917 15,413 MMBtu $4.93
TOTAL ENERGY COSTS $165,135
RECOMMENDED SAVINGS* $38,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,201
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$11,245
Cost:
$3,224
- - - - $11,245 2,235 - - -
-
kWh
-
-
kW-months/year
$11,245
2,235
MMBtu
-
-
lb
02: 2.2428 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC Savings:
$8,529
Cost:
$3,300
- - - - $8,529 1,732 - - -
-
kWh
-
-
kW-months/year
$8,529
1,732
MMBtu
-
-
lb
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,643
Cost:
$2,128
$1,447 15,200 $196 540 - - - - $1,447
15,200
kWh
$196
540
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,402
Cost:
$5,673
$2,028 20,090 $374 1,020 - - - - $2,028
20,090
kWh
$374
1,020
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,316
Cost:
$6,961
$2,981 21,978 $335 912 - - - - $2,981
21,978
kWh
$335
912
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,201
Cost:
$9,000
$1,900 19,436 $301 828 - - - - $1,900
19,436
kWh
$301
828
kW-months/year
-
-
MMBtu
-
-
lb
07: 3.6111 USE ALTERNATIVE FLOCCULENT TO MINIMIZE SLUDGE VOLUME Savings:
$8,950
Cost:
$16,000
- - - - - - $8,950 22 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,950
22
lb
TOTAL RECOMMENDED Savings:
$38,286
Cost:
$46,286
$8,356 76,704 $1,206 3,300 $19,774 3,967 $8,950 22 $8,356
76,704
kWh
$1,206
3,300
kW-months/year
$19,774
3,967
MMBtu
$8,950
22
lb
TOTAL IMPLEMENTED Savings:
$2,201
Cost:
$9,000
$1,900 19,436 $301 828 - - - - $1,900
19,436
kWh
$301
828
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)