IAC Assessment: SF0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2000
Principal Product Partitions
NAICS n/a
SIC 2675 - Die-cut Paper And Board
Sales $10,000,000-$50,000,000
# of Employees 71
Plant Area (Sq.Ft.) 75,000
Annual Production 70,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,429 1,242,520 kWh $0.09
Natural Gas $10,733 1,654 MMBtu $6.49
TOTAL ENERGY COSTS $85,390
RECOMMENDED SAVINGS* $166,796 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,721
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$5,651
Cost:
$3,306
$5,651 55,696 - - - - $5,651
55,696
kWh
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,324
Cost:
$1,467
$1,324 9,802 - - - - $1,324
9,802
kWh
-
-
lb
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$848
Cost:
$1,200
$848 9,205 - - - - $848
9,205
kWh
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,297
Cost:
$5,880
$2,297 24,275 - - - - $2,297
24,275
kWh
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,100
Cost:
$3,250
$1,100 12,185 - - - - $1,100
12,185
kWh
-
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$124,556
Cost:
$60,000
- - $124,556 341 - - -
-
kWh
$124,556
341
lb
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,147
Cost:
$10,300
- - $3,147 53 - - -
-
kWh
$3,147
53
lb
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$27,873
Cost:
$2,000
- - - - $27,873 - -
-
kWh
-
-
lb
$27,873
-
$
TOTAL RECOMMENDED Savings:
$166,796
Cost:
$87,403
$11,220 111,163 $127,703 394 $27,873 - $11,220
111,163
kWh
$127,703
394
lb
$27,873
-
$
TOTAL IMPLEMENTED Savings:
$4,721
Cost:
$10,597
$4,721 46,262 - - - - $4,721
46,262
kWh
-
-
lb
-
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes