IAC logo
IAC Assessment: SF0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2001
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 50,000
Annual Production 7,500 Thousand Feet
Production Hrs. Annual 6,968
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $782,504 9,373,352 kWh $0.08
Natural Gas $18,188 2,425 MMBtu $7.50
TOTAL ENERGY COSTS $800,692
RECOMMENDED SAVINGS* $64,271 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,930
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$606
Cost:
-
$606 7,216 - - $606
7,216
kWh
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,471
Cost:
$400
$3,471 41,585 - - $3,471
41,585
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$864
Cost:
$399
$864 10,351 - - $864
10,351
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$27,587
Cost:
$26,393
$27,587 330,479 - - $27,587
330,479
kWh
-
-
MMBtu
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,324
Cost:
$2,880
$1,324 15,856 - - $1,324
15,856
kWh
-
-
MMBtu
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$2,327
Cost:
$4,202
$2,327 27,872 - - $2,327
27,872
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,441
Cost:
$3,971
$1,441 17,264 - - $1,441
17,264
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,739
Cost:
$6,370
$1,739 20,832 - - $1,739
20,832
kWh
-
-
MMBtu
09: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$24,912
Cost:
$46,855
$40,385 483,773 $(-15,473) (-2,063) $40,385
483,773
kWh
$(-15,473)
(-2,063)
MMBtu
TOTAL RECOMMENDED Savings:
$64,271
Cost:
$91,470
$79,744 955,228 $(-15,473) (-2,063) $79,744
955,228
kWh
$(-15,473)
(-2,063)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,930
Cost:
$2,880
$1,930 23,072 - - $1,930
23,072
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas