Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2002 |
Principal Product | Sealants |
NAICS | n/a |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 17 |
Plant Area (Sq.Ft.) | 49,755 |
Annual Production | 9,000 Thousand Gallons |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $110,571 | 928,460 | kWh | $0.12 |
Natural Gas | $8,612 | 679 | MMBtu | $12.68 |
TOTAL ENERGY COSTS | $130,179 | |||
RECOMMENDED SAVINGS* | $23,385 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $938 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.7392 APPLY A PROTECTIVE COATING TO RACKS AND TANKS |
Savings: $401 Cost: - |
$401 | 5,072 | - | - | - | - |
$401 5,072 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $537 Cost: $474 |
$537 | 3,569 | - | - | - | - |
$537 3,569 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5123 REDUCE FLUID FLOW RATES |
Savings: $2,233 Cost: $3,211 |
$2,233 | 16,618 | - | - | - | - |
$2,233 16,618 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $1,207 Cost: $2,607 |
- | - | $1,207 | 96 | - | - |
- - kWh |
$1,207 96 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $1,420 Cost: $3,720 |
$1,420 | 9,449 | - | - | - | - |
$1,420 9,449 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $689 Cost: $1,783 |
$689 | 7,361 | - | - | - | - |
$689 7,361 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $8,785 Cost: $25,000 |
- | - | - | - | $8,785 | - |
- - kWh |
- - MMBtu |
$8,785 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $8,113 Cost: $24,200 |
- | - | - | - | $8,113 | - |
- - kWh |
- - MMBtu |
$8,113 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,385 Cost: $60,995 |
$5,280 | 42,069 | $1,207 | 96 | $16,898 | - | $5,280 42,069 kWh |
$1,207 96 MMBtu |
$16,898 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $938 Cost: $474 |
$938 | 8,641 | - | - | - | - | $938 8,641 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |