IAC logo
IAC Assessment: SF0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2002
Principal Product Thin Film Optics
NAICS n/a
SIC 3827 - Optical Instruments And Lenses
Sales >$500,000,000
# of Employees 1,138
Plant Area (Sq.Ft.) 490,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,928,989 65,006,307 kWh $0.05
Natural Gas $246,245 47,249 MMBtu $5.21
TOTAL ENERGY COSTS $3,408,202
RECOMMENDED SAVINGS* $521,556 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,403
Cost:
$913
$8,403 85,618 - - - - $8,403
85,618
kWh
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,732
Cost:
$4,138
$5,732 63,050 - - - - $5,732
63,050
kWh
-
-
MMBtu
-
-
lb
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$20,883
Cost:
$15,071
$20,883 218,586 - - - - $20,883
218,586
kWh
-
-
MMBtu
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,328
Cost:
$42,988
$48,328 652,416 - - - - $48,328
652,416
kWh
-
-
MMBtu
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,557
Cost:
$20,529
$22,557 247,412 - - - - $22,557
247,412
kWh
-
-
MMBtu
-
-
lb
06: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS Savings:
$2,391
Cost:
$2,193
$2,391 28,742 - - - - $2,391
28,742
kWh
-
-
MMBtu
-
-
lb
07: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM Savings:
$5,916
Cost:
$5,753
$5,916 83,360 - - - - $5,916
83,360
kWh
-
-
MMBtu
-
-
lb
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$7,529
Cost:
$8,040
$7,529 80,792 - - - - $7,529
80,792
kWh
-
-
MMBtu
-
-
lb
09: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$6,658
Cost:
$8,500
- - $6,658 1,330 - - -
-
kWh
$6,658
1,330
MMBtu
-
-
lb
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,934
Cost:
$27,835
$10,934 117,019 - - - - $10,934
117,019
kWh
-
-
MMBtu
-
-
lb
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,491
Cost:
$6,516
$2,491 27,300 - - - - $2,491
27,300
kWh
-
-
MMBtu
-
-
lb
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$73,389
Cost:
$280,599
$73,389 783,110 - - - - $73,389
783,110
kWh
-
-
MMBtu
-
-
lb
13: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$298,889
Cost:
$560,000
- - - - $298,889 - -
-
kWh
-
-
MMBtu
$298,889
-
lb
14: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,215
Cost:
$15,574
- - - - $5,215 - -
-
kWh
-
-
MMBtu
$5,215
-
lb
15: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,241
Cost:
$7,875
- - - - $2,241 - -
-
kWh
-
-
MMBtu
$2,241
-
lb
TOTAL RECOMMENDED Savings:
$521,556
Cost:
$1,006,524
$208,553 2,387,405 $6,658 1,330 $306,345 - $208,553
2,387,405
kWh
$6,658
1,330
MMBtu
$306,345
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)