Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2002
Principal Product Irrigation Equipment
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 120,214
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,435 1,575,360 kWh $0.11
Electricity Demand $55,212 12,832 kW-months/year $4.30
Natural Gas $8,280 1,221 MMBtu $6.78
TOTAL ENERGY COSTS $243,941
RECOMMENDED SAVINGS* $41,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,234
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,347
Cost:
$240
$3,347 25,921 - - $3,347
25,921
kWh
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$10,716
Cost:
$1,500
$10,716 113,466 - - $10,716
113,466
kWh
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,052
Cost:
$767
$2,052 14,710 - - $2,052
14,710
kWh
-
-
$
04: 2.5123 REDUCE FLUID FLOW RATES Savings:
$5,761
Cost:
$4,416
$5,761 41,604 - - $5,761
41,604
kWh
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$973
Cost:
$975
$973 7,469 - - $973
7,469
kWh
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,777
Cost:
$1,770
$1,777 17,374 - - $1,777
17,374
kWh
-
-
$
07: 2.5123 REDUCE FLUID FLOW RATES Savings:
$5,887
Cost:
$5,671
$5,887 29,131 - - $5,887
29,131
kWh
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,004
Cost:
$984
$1,004 7,863 - - $1,004
7,863
kWh
-
-
$
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,758
Cost:
$4,451
$1,758 13,965 - - $1,758
13,965
kWh
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,349
Cost:
$18,180
$4,349 33,376 - - $4,349
33,376
kWh
-
-
$
11: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$3,383
Cost:
-
- - $3,383 - -
-
kWh
$3,383
-
$
TOTAL RECOMMENDED Savings:
$41,007
Cost:
$38,954
$37,624 304,879 $3,383 - $37,624
304,879
kWh
$3,383
-
$
TOTAL IMPLEMENTED Savings:
$9,234
Cost:
$5,911
$9,234 55,052 - - $9,234
55,052
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees