IAC Assessment: SF0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2003
Principal Product Water Valves
NAICS 221310 - Water Supply and Irrigation Systems
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 60,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $758,286 7,061,881 kWh $0.11
Electricity Demand $208,755 16,890 kW-months/year $12.36
Natural Gas $4,911 669 MMBtu $7.34
TOTAL ENERGY COSTS $971,952
RECOMMENDED SAVINGS* $324,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $189,068
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,760
Cost:
$300
$3,833 35,921 $927 71 - - - - - - $3,833
35,921
kWh
$927
71
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$731
Cost:
$100
$590 5,467 $141 11 - - - - - - $590
5,467
kWh
$141
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,715
Cost:
$5,241
$11,969 112,706 $2,746 225 - - - - - - $11,969
112,706
kWh
$2,746
225
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,493
Cost:
$8,340
$7,493 70,599 - - - - - - - - $7,493
70,599
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
05: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$4,415
Cost:
$3,108
$2,892 27,000 $678 54 - - $845 (-115) - - $2,892
27,000
kWh
$678
54
kW-months/year
-
-
$
$845
(-115)
MMBtu
-
-
lb
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,834
Cost:
$23,076
$11,253 105,958 $2,581 212 - - - - - - $11,253
105,958
kWh
$2,581
212
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$173,236
Cost:
$360,625
$140,850 1,323,124 $32,386 2,646 - - - - - - $140,850
1,323,124
kWh
$32,386
2,646
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,606
Cost:
$9,060
$3,472 33,070 $1,134 95 - - - - - - $3,472
33,070
kWh
$1,134
95
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
09: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$850
Cost:
$2,280
$695 6,264 $155 19 - - - - - - $695
6,264
kWh
$155
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,735
Cost:
$23,266
$4,569 42,984 $1,166 96 - - - - - - $4,569
42,984
kWh
$1,166
96
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,000
Cost:
$16,250
- - - - - - - - $7,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,000
-
lb
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,154
Cost:
$11,258
- - - - $5,154 - - - - - -
-
kWh
-
-
kW-months/year
$5,154
-
$
-
-
MMBtu
-
-
lb
13: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$82,464
Cost:
$264,000
- - - - $82,464 - - - - - -
-
kWh
-
-
kW-months/year
$82,464
-
$
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$324,993
Cost:
$726,904
$187,616 1,763,093 $41,914 3,429 $87,618 - $845 (-115) $7,000 - $187,616
1,763,093
kWh
$41,914
3,429
kW-months/year
$87,618
-
$
$845
(-115)
MMBtu
$7,000
-
lb
TOTAL IMPLEMENTED Savings:
$189,068
Cost:
$393,351
$153,314 1,440,566 $35,754 2,919 - - - - - - $153,314
1,440,566
kWh
$35,754
2,919
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)