Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2004 |
Principal Product | Frozen and Canned Food |
NAICS | 311422 - Specialty Canning |
SIC | 2032 - Canned Specialties |
Sales | $100,000,000-$500,000,000 |
# of Employees | 700 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 4,500,000 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,004,637 | 8,631,330 | kWh | $0.12 |
Electricity Demand | $238,634 | 18,916 | kW-months/year | $12.62 |
Natural Gas | $367,504 | 54,759 | MMBtu | $6.71 |
TOTAL ENERGY COSTS | $2,004,033 | |||
RECOMMENDED SAVINGS* | $384,226 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $136,081 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,759 Cost: - |
$2,759 | 30,923 | - | - | - | - | - | - |
$2,759 30,923 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,304 Cost: - |
$1,104 | 9,804 | $200 | 16 | - | - | - | - |
$1,104 9,804 kWh |
$200 16 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,636 Cost: $829 |
$1,697 | 14,583 | $(-61) | (-5) | - | - | - | - |
$1,697 14,583 kWh |
$(-61) (-5) kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $33,377 Cost: $31,490 |
$28,383 | 243,878 | $4,994 | 396 | - | - | - | - |
$28,383 243,878 kWh |
$4,994 396 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $61,990 Cost: $40,000 |
$53,976 | 463,775 | $8,014 | 635 | - | - | - | - |
$53,976 463,775 kWh |
$8,014 635 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $19,808 Cost: $20,000 |
- | - | - | - | $19,808 | 2,952 | - | - |
- - kWh |
- - kW-months/year |
$19,808 2,952 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,284 Cost: $1,218 |
- | - | - | - | $1,284 | 191 | - | - |
- - kWh |
- - kW-months/year |
$1,284 191 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,669 Cost: $10,828 |
$5,461 | 46,992 | $1,208 | 96 | - | - | - | - |
$5,461 46,992 kWh |
$1,208 96 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,066 Cost: $2,688 |
$685 | 5,882 | $381 | 30 | - | - | - | - |
$685 5,882 kWh |
$381 30 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.2171 USE AN AUTOMATIC PLATE PROCESSOR |
Savings: $27,300 Cost: $40,500 |
- | - | - | - | - | - | $27,300 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$27,300 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $227,033 Cost: $40,600 |
$227,033 | - | - | - | - | - | - | - |
$227,033 - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $384,226 Cost: $188,153 |
$321,098 | 815,837 | $14,736 | 1,168 | $21,092 | 3,143 | $27,300 | - | $321,098 815,837 kWh |
$14,736 1,168 kW-months/year |
$21,092 3,143 MMBtu |
$27,300 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $136,081 Cost: $127,553 |
$92,961 | 806,033 | $14,536 | 1,152 | $1,284 | 191 | $27,300 | - | $92,961 806,033 kWh |
$14,536 1,152 kW-months/year |
$1,284 191 MMBtu |
$27,300 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |