IAC Assessment: SF0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2004
Principal Product Heat Treated and Brazed Parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 21
Plant Area (Sq.Ft.) 18,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,648
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,476 1,157,280 kWh $0.10
Electricity Demand $54,601 5,408 kW-months/year $10.10
Natural Gas $78,794 9,724 MMBtu $8.10
TOTAL ENERGY COSTS $249,346
RECOMMENDED SAVINGS* $30,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,503
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,527
Cost:
$2,527
$2,527 22,068 - - - - $2,527
22,068
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$956
Cost:
$180
$816 8,325 $140 14 - - $816
8,325
kWh
$140
14
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,280
Cost:
$1,280
$1,126 11,482 $154 15 - - $1,126
11,482
kWh
$154
15
kW-months/year
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$864
Cost:
$1,183
$729 7,434 $135 13 - - $729
7,434
kWh
$135
13
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,525
Cost:
$12,060
$7,188 73,311 $1,337 132 - - $7,188
73,311
kWh
$1,337
132
kW-months/year
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$270
Cost:
$885
$228 2,347 $42 4 - - $228
2,347
kWh
$42
4
kW-months/year
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,506
Cost:
$6,000
$3,916 39,936 $970 96 $(-1,380) (-170) $3,916
39,936
kWh
$970
96
kW-months/year
$(-1,380)
(-170)
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,750
Cost:
$6,748
$3,195 32,582 $555 55 - - $3,195
32,582
kWh
$555
55
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$449
Cost:
$960
$379 3,864 $70 7 - - $379
3,864
kWh
$70
7
kW-months/year
-
-
MMBtu
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,873
Cost:
$100
$7,873 - - - - - $7,873
-
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,000
Cost:
$31,923
$27,977 201,349 $3,403 337 $(-1,380) (-170) $27,977
201,349
kWh
$3,403
337
kW-months/year
$(-1,380)
(-170)
MMBtu
TOTAL IMPLEMENTED Savings:
$7,503
Cost:
$10,340
$6,766 65,322 $737 73 - - $6,766
65,322
kWh
$737
73
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas