Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2004 |
Principal Product | Non- carbonated beverages |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 345,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 4,500 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $430,575 | 4,003,070 | kWh | $0.11 |
Electricity Demand | $218,465 | 17,308 | kW-months/year | $12.62 |
Natural Gas | $939,680 | 132,325 | MMBtu | $7.10 |
TOTAL ENERGY COSTS | $1,720,050 | |||
RECOMMENDED SAVINGS* | $248,615 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,641 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $13,186 Cost: - |
$9,476 | 88,151 | $3,710 | 294 | - | - | - | - | - | - | - | - |
$9,476 88,151 kWh |
$3,710 294 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,309 Cost: - |
$4,733 | 43,993 | - | - | - | - | - | - | - | - | $576 | - |
$4,733 43,993 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$576 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,072 Cost: - |
$3,130 | 29,122 | $942 | 74 | - | - | - | - | - | - | - | - |
$3,130 29,122 kWh |
$942 74 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,231 Cost: $617 |
- | - | - | - | $2,231 | 300 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,231 300 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $15,496 Cost: $4 |
$12,649 | 117,668 | $2,847 | 226 | - | - | - | - | - | - | - | - |
$12,649 117,668 kWh |
$2,847 226 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,732 Cost: $2 |
$6,647 | 61,841 | $2,085 | 163 | - | - | - | - | - | - | - | - |
$6,647 61,841 kWh |
$2,085 163 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,456 Cost: $15 |
$16,298 | 151,254 | $4,158 | 329 | - | - | - | - | - | - | - | - |
$16,298 151,254 kWh |
$4,158 329 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $708 Cost: $600 |
$435 | 4,050 | $273 | 22 | - | - | - | - | - | - | - | - |
$435 4,050 kWh |
$273 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,885 Cost: $6 |
$5,481 | 50,985 | $1,404 | 111 | - | - | - | - | - | - | - | - |
$5,481 50,985 kWh |
$1,404 111 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $870 Cost: $1,019 |
- | - | - | - | $870 | 119 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$870 119 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $643 Cost: $854 |
$490 | 4,554 | $153 | 12 | - | - | - | - | - | - | - | - |
$490 4,554 kWh |
$153 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $494 Cost: $646 |
$344 | 3,203 | $150 | 12 | - | - | - | - | - | - | - | - |
$344 3,203 kWh |
$150 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5132 REUSE RICH WHITE WATER IN OTHER APPLICATIONS |
Savings: $16,014 Cost: - |
- | - | - | - | - | - | $16,014 | 2,500,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,014 2,500,000 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $22,900 Cost: $20,000 |
- | - | - | - | - | - | - | - | $22,900 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$22,900 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $130,619 Cost: $218,815 |
$130,619 | - | - | - | - | - | - | - | - | - | - | - |
$130,619 - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $248,615 Cost: $242,578 |
$190,302 | 554,821 | $15,722 | 1,243 | $3,101 | 419 | $16,014 | 2,500,000 | $22,900 | - | $576 | - | $190,302 554,821 kWh |
$15,722 1,243 kW-months/year |
$3,101 419 MMBtu |
$16,014 2,500,000 Tgal |
$22,900 - lb |
$576 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,641 Cost: $3,127 |
$18,130 | 168,626 | $4,065 | 320 | $870 | 119 | - | - | - | - | $576 | - | $18,130 168,626 kWh |
$4,065 320 kW-months/year |
$870 119 MMBtu |
- - Tgal |
- - lb |
$576 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |