Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2005
Principal Product tomato sauce
NAICS 311421 - Fruit and Vegetable Canning
SIC 2003 -
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 896,465
Annual Production 400,000 Tons
Production Hrs. Annual 3,616
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,096,481 10,353,000 kWh $0.11
Natural Gas $1,000,000 773,033 MMBtu $1.29
TOTAL ENERGY COSTS $3,096,481
RECOMMENDED SAVINGS* $308,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,253
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,253
Cost:
$924
$3,253 49,321 - - - - - - - - - - $3,253
49,321
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$46,562
Cost:
$7,250
- - - - $46,562 6,162 - - - - - - -
-
kWh
-
-
kW-months/year
$46,562
6,162
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,245
Cost:
$4,237
- - - - $7,245 953 - - - - - - -
-
kWh
-
-
kW-months/year
$7,245
953
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$127,648
Cost:
$99,552
$31,432 371,100 $4,968 522 $91,248 12,006 - - - - - - $31,432
371,100
kWh
$4,968
522
kW-months/year
$91,248
12,006
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,088
Cost:
$22,853
$11,658 108,947 $2,430 270 - - - - - - - - $11,658
108,947
kWh
$2,430
270
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,408
Cost:
$2,520
$1,039 7,914 $369 41 - - - - - - - - $1,039
7,914
kWh
$369
41
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,215
Cost:
$6,387
$2,580 22,257 $635 71 - - - - - - - - $2,580
22,257
kWh
$635
71
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,345
Cost:
$13,619
$4,260 36,327 $1,085 121 - - - - - - - - $4,260
36,327
kWh
$1,085
121
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,916
Cost:
$18,347
$5,958 56,941 $5,958 126 - - - - - - - - $5,958
56,941
kWh
$5,958
126
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$35,920
Cost:
$138,400
- - - - - - - - - - $35,920 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$35,920
-
$
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$29,001
Cost:
-
- - - - - - - - $29,001 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$29,001
-
lb
-
-
$
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,421
Cost:
$385
- - - - - - - - $5,421 120,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,421
120,000
lb
-
-
$
13: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$17,440
Cost:
$8,393
- - - - - - $17,440 9,112 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,440
9,112
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$308,462
Cost:
$322,867
$60,180 652,807 $15,445 1,151 $145,055 19,121 $17,440 9,112 $34,422 120,000 $35,920 - $60,180
652,807
kWh
$15,445
1,151
kW-months/year
$145,055
19,121
MMBtu
$17,440
9,112
Tgal
$34,422
120,000
lb
$35,920
-
$
TOTAL IMPLEMENTED Savings:
$3,253
Cost:
$924
$3,253 49,321 - - - - - - - - - - $3,253
49,321
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost